UNITED STATES
[" g
g
NUCLEAR REGULATORY COMMISSION
,r
REGION ll
o,
101 MARIETTA ST
N.W., SulTE 3100
o
ATLANTA, GEORGIA 30303
- '
JVL 181980
In Reply Refer To:
RII:VLB
50-369/80-8
50-370/80-5
50-413/80-9
50-414/80-9
50-491/80-7
50-492/80-6
50-493/80-6
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers :o the inspection conducted by V. L. Brownlee of this office on
May 19-23, l',80, of activities authorized by NRC Constructica Permit Nos. CPPR-83,
CPPR-84, CPPR-116, CPPR-117, CPPR-167, CPPR-168 and CPPR- 169 for the McGuire,
Catawba anJ Cherokee facilities, and to the discusion of our findings held with
L. C. Dail and J. R. Wells at the conclusion of the inspection.
Areas examined ~ during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 days of your
receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any sucl
8010800 %
JUL 181980
.
4
Duke Power Company
-2-
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Shauld you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
b'. E
y
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-369/80-8, 50-370/80-5,
50-413/80-9, 50-414/80-9, 50-491/80-7,
50<492/80-6 and 50-493/80-6