ML19332D218
| ML19332D218 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 11/21/1989 |
| From: | Mcneil S Office of Nuclear Reactor Regulation |
| To: | Creel G BALTIMORE GAS & ELECTRIC CO. |
| References | |
| TAC-75223, NUDOCS 8911300172 | |
| Download: ML19332D218 (4) | |
Text
gy y <
2 Q,y w
$k p
[,
Novstbar21h1989-JQ "r
3.w y
- .6 m
/
< y' tjocket No'. - 50 318 4
- D"S"RIBUTION-J h
nams.me# NRC & Local PDRs" 3
PDI.1 Rdg' SVarga
@.. i
,4J, CVogan BBoger i
7, m ;
RCapra OGC t
y 7
JWiggins-EJordan:
i (,
Mr. G.:C. Creel...
'ACRS-(10)-
'SMcNeil P
f iVice President. Nuclear Energy 4
Baltimore Gas and Electric Company 1
Calvert' Cliffs Nuclear Power Plant-c f f'
- MD Rtes. 2:8'4
?
F*
~g iP.O. Box 1535; T Lusby, Maryland : 20657-e ' e.
Si,7 l
Dear Mr. :
Creel:
j g
j
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION. TEMPORARY TECHNICAL 4
W L,"
. - 'SPECIFICATI0NiSURVEILLANCE INTERVAL EXTENSION FOR CALVERT CLIFFS:
'e,
& UNIT 2 CONTAINMENT' INTEGRATED LEAK RATE TEST (UNIT 2 TAC 75223) r.e m
1 s 4) l'
..1
{ v)
'+%j 4
l 3*'
%Your-applic'ation 'd$ted October 27,1989' requested a temporary extension of the a
1CalvertC]iffsUnit'2l Technical; Specification:(TS)surveillanceperiodfor.
u O
i
- ' C perforniing"the Unit 2! containment integrated-leak rate test.
t gg, t ',e 9
.. j.
jfyJThetNRCistafflhaslcompletedan-initia.
- cfdeterminedithat additional information,1 review of your ap;' Ration and has -
-is needed to comple
's review.
p-
' ' [, 9 J.f WfPleaseproYide'a) certified?responseprovidingtheinformat mested in the '
mw
.,np_
p<y C'Tenclosed deques't'.for additional;information within 28 days
, letter's D
Wissuance da~te.-
'ls m u
- y SThis' req % p, xuestforcinformationaffectsfewerthan10 respondents;therefore,OMB 3
clearance is not required utder Public Law 96 511'.
~
3 m
+ f, y
j.
Sincerely, m
"1 4
Scott Alexander McNeil, Project Manager j
2 j
Project Directorate!I-1 j
^
Division-of: Reactor Projects:- I/II j
y
- Office of Nuclear Reactor Regulation' 1
L
Enclosure:
s M
RAI'
,1 y
cc:;W/ enclosure l
L.
- See-next page 4
i
.. t..
S UFC,:PDI.1_
. PDI-l
- PDI-1
. :...,4)4!./... :............ ::............ :: _.. _ _ _ _.... ::. _ _
lNAME :CVo an QJF:SMcN
/ba
'RCapra 4DATE { j { gQg :;g/g/g,,: il[p_Q81 t
6 f0FFICIAL RECORD' COPY t
o ; Document-Name;. RAT Tar 75223 0\\
8911300172 891121 24 PDR ADOCK 05000318
\\
i p
PDC i
a lnh
! g.
lp g
^
9
[%c/ 3[.
" UNITED STATES -
f, NUCLEAR REGULATORY COMMISSION
'n-l j
WASHWOTON, D C. 20555 h
=a...+[-
L November 21, 1989
')
p q
LDocketLNo.'50-318 j
%~
o 3
Y Y;
-Mr..G.lC. Creel 9
Vice President - Nuclear Energy-k Baltimore Gas and Electric Company
,' g Calvert: Cliffs-Nuclear. Power Plant MDERtes. 2 & 4 7
P.O.? Box 1535.
, Lusby, Maryland 20657 i
Dear Mr.JCreel:
o e
c
SUBJECT:
=' REQUEST FOR ADDITIONAL INFORMAT!0N -' TEMPORARY TECHNICAL
-SPECIFICATION SURVEILLANCE INTERVAL EXTENSION'FOR CALVERT CLIFFS
_'t UNIT'2CONTAINMENTINTEGRATEDLEAKRATETEST(UNIT 2 TAC 75223)-
.i lYour application dated-October.27,1989 requested a temporary extension of the,
a p4 LCalvert Cliffs Unit 2 Technical Specification (TS) surveillance period for=
1
- performing
- the Unit 2 containment.integratedcleak rate test.
+
o TheLNRC staff has completed an initial review of your application and has 0
determined that additional:information is needed to complete its review.
-i t
Please pro' vide a certified response providing the information requested'ir,the enclosed request for additional information within 28 days'of this letter's Ll/
issuance'date.
Thisr'questffer'informationaffectsfewerthan10 respondents;therefore,OMB-e y'
. clearance?is not required under Public-Law 96-511.
1
-)
Sincerely, 1
L Scott Alexander McNeil, Project Manager a.
Project Directorate I-1 u:3 Division of Reactor Projects - I/II-Office of Nuclear Reactor Regulation
. o
Enclosure:
4 RAI-cc: w/ enclosure See next page h
1 o.
L
,ao r-,
U s
p Mr. G. C. Creel Baltimore Gas & Electric Company Calvert Cliffs Nuclear Power Plant cc:
Mr. William T. Bowen, President Mr. Joseph H. Walter Calvert County Board of Engineering Division Comissioners Public Service Comission of Maryland i.
Prince Frederick, Maryland 20678 American Building L
231 E. Baltimore Street Baltimore, Maryland 21202-3486 D. A. Brune. Esq.
General Counsel Baltimore Gas and Electric Company Ms. Kirsten A. Burger, Esq.
P. O. Box 1475 Maryland People's Counsel Baltimore, Maryland 21203 American Building, 9th Floor 231 E. Baltimore Street i
Mr. Jay E. Silberg, Esq.
Baltimore, Maryland 21202 Shaw, Pittiaan, Potts and Trowbridge 2300 N Street, NW Washington, DC 20037 Mr. W. J. Lippold, General Supervisor Technical Services Engineering Calvert Cliffs Nuclear Power Plant MD Rts 2 & 4, P. O. Box 1535 Lusby, Maryland 20657 Resident Inspector c/o U.S. Nuclear Regulatory Comission P. O. Box 437 I
Lusby, Maryland 20657 Mr. Thomas Magette Administrator - Nucleer Evaluations Department of Natural Resources 580 Teylor Avenue Tawes Stcte Office Building PPER B?
Annapolis, Maryland 21401 Regional Administrator, Region !
V.S Nuclear Regulatory Comission i
475 Allendale Road King of Prussia, Pennsylvania 19406 P
)
e s
L REQUl:ST FOR. ADDITIONA r INFOR4 TION L'
"%,T. mWKL EA5 AND 0.LG I N I G. WmFAMT CALVtu 4LIrr5 NUGLEAR
'UNER PLANT. UNIT 2 NGET WD,.50-318 PROPOSED CauTA:nnt.xI IuTasRATED LEAK RATE.Tg3T 5URVEILLAwct PERIOD EKTinsION 1.
Section III.D.I.(a) 10 CFR Part 50. Appendix J requires that "After the preoperational leakage rate tests, a set of three Type t tests shall be performed, at approximately equal intervals during each 10-year service
[
period. The third test of each set shall be conducted when the plant is shutdown for the 10-year plant inservice inspections."
The Unit 210-year inservice inspection (ISI) period commenced on April 1, l
1977 and ended on July 3, 1987. During that period, containment integrated leak rate tests (ILRT) were completed at Unit 2 on November 15, 1975 December 18, 1982 and November 24, 1985. No ILRT was performed i
during the first Unit 210-year ISI outage, r
please provide your schedule for the performance of ILRTs to be conducted during the second Unit 2 10-year ISI interval, i
2.
During the period of March 1989 through July 1989, Types B and C local leak rate tests were conducted on Unit 2 containment penetrations.
To provide reasonably satisfactory assurances regerding the current condition of containment penetrations, particularly during core alterations operations, please provide t
a.
the combined Types B and C results of these tests in units of SCCM, l
and b
the individual test rests, test dates and test acceptance criteria I
for all penetrations in the Unit 2 containment providing air-to-air direct access from insiae containment to outside the containment (including into penetration rooms).
3.
Your application references STP-M-622 as providing the test methodology that necessitated the request for a surveillance interval extension.
Please provide STP-M-622.
4 The length of the current period between Unit 2 ILRTs is expected to be l
16-20 months longer than any previous ILRT interval. To provide l
continued assurances of the continued structural integrity of the Unit 2 containment, please provide a comitment to:
a.
perform the containment inspection required by Section V.A. of 10 CFR part 50, Appendix J before conducting any core alterations at
)
Unit 2, and L
b.
reporting the results of this containment inspection in writing to L
the NRC before conducting any core alterations at Unit 2.
1 l-l
~
-