.NEW YORK POWER AUD10RITY 1 JAMES A.- FITZPATRICK NUCLEAR POWER FIANT tT e.V!
0PERATING DATA REPOKr 4
3 L
DOCKET NO:~50-333:
J INIT NAME FITZPATRICK DATE NOVEMBER 1989
- m COMPLETED BY
- JOHN'000K TELEPHONE '(315)-349-6569
~
' OPERATING STATUS-i cl q LNIT NAME:
FITZPATRICK-NOTES 2..
REPORTING m IOD: 891030 891031 J3. 2 LICEtEED THERMAL POWER (MRI):
2436 24 :
NAMEPLATE RATING-(GROSS MWE):
883
? 5.':
DESIW ELECTRICAL RATING. (NET NE):
816-
. 6 ~. -
MAXIMLN DEPENDABLE CAPACITY (GROSS LEE):
785 i
17.
MAXIMLN DEPENDABLE CAPACITY (NET IWE):
757 p
8.
-IF CHANGES 00 CUR IN CAPACITY RATINGS -(ITEMS 3 - 7) SINCE IAST REPORT,- GIVE RFASONSr-e 19; POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET LEE):
l 10.~
REASONS FOR RESTRICTIONS, IF ANY:
THIS lONTH YR-10-DATE CUMULATIVE fil.
HOURS IN REPORTING PERIOD.--
745:
'7296 125041
' 212 NIEBER OF HOURS REACIOR WAS CRITICAL =.
628.5 6825.1 92538.4 L.
E13.
REACIOR RESERVE SHUTDOWN HOURS.
0 0
0
- 14; HOURS GENERA 10R ON-LINE.
578. t>
6772.4 89971.6
- 15.
UNIT RESERVE SHUTDOWN HOURS.
0 0
0 l'
16.
GROSS THERMAL ENERGY GENERATED (MWH).
1315824 16222320 196819564
- 17. -
GROSS ELECTRICAL ENERGY GENERATED (IMI).
445320 5523000 67207560 l.
.18..
NET ELECTRICAL ENERGY GENERATED (MWH).
430765 5334820 64470165
~
' 19.1 UNIT SERVICE FACIOR..
77.7 92.8 72.0 L
20.' -
UNIT AVAILABILITY FACIOR.
77.7 92.8 72.0 f21 UNIT CAPACITY FACIOR (USING MDC NET).
76.4-96.6 66.4
'22..
UNIT CAPACITY FACIOR (USING DER NET).
70.9 89.6
-63.2 c23.-
UNIT FORCED OLTfAGE RATE.
O 0
10.2
'24.
SHUIDOWNS SCHEDULED OVER NEXT 6 FDNTHS (TYPE, DATE AND DURATION OF EACH):
REFUEL OUTAGE SCHEDULED FOR MARCH 31,1990,10 IAST APPROXIMATELY 50 DAYS J25..
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
126.
' UNITS IN TEST STATUS (PRIOR TO CatNERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY C0tHERCIAL OPERATION 8911290192 091109 f
PDR ADOCK 05000333
,R; PDR 1
n
'e s
y; 3;;
pr 5NEW YORK ^ POWER.-hUTHORITY x,-[ * -
<-JAMESiAi;FITZPATRICK NUCLEAR POWER PLANT-
. AVERAGE DAILY UNIT" POWER LEVEL
.w DOCKET NO::50-333 UNIT: FITZPATRICK
-DATE:. NOVEMBER-1989 COMPLETED BY:" JOHN COOK 4
TELEPIONE: -(315)349-6569 :-
lONDis. OCTOBER 1989~
- g.
0 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL Mie NET IWe }ET
-1 0
17 804 2'
0 18 805:
A
-3 0
19 805 4
0 20 807 5
0' 21 806 6'
0 22 805
'7 6
23 805
.i q
'. 8.
L 129 24 804 j
9 263-25 806 110:
687 26 805 0
- 11-:
741 27 805-12-
'786 28 805 13 804-29 838-14 804-30
-805 15 805 31 805 161 804:
.SU44ARY: The unit returned to service on October 7,1989, and operated at near full themal pwer for the remainder of the reporting period.
4 4
h 5
y,.
,. m
[_
~.
NIE YORK POWER AUIHORITY
^
DOCKET'NDr 50-333:-
^^ UNIT NAMEO FITZPATRICK -
<d JAMES A. FITZPATRICK NUCLEAR POWER PLANT MTE: NOVEMBER'19895 -
UNIT SHUIDOWNS REPORT.
~
03fLETED BY:JJ015 00Gt.
Ridun M)NDI: OCIDBER 1989 '
TELEPHONE:: (3,15)349-6569j m
^C D:
U"
~
C C
CAUSE AND 00 ERECTIVE ACTION R
AU-A~
SHUTTING LICENSEE S 0:
- P O
-TO NO-DATE TYPE
- T R ~
S DOWN EVENT TD
'OD PREVENT RECURRENCE IS O
THE REPORT
.E E N. E.
-0' N
REACIOR
,M
.E' N
T 4
891001 S
166.4 B
1 N/A N/A
~N/A' SHUrDOWN FOR 00NIROL ROD DRIVE MAINTENAtCE
'(ctmulative hours 523.7)~
3-4 1
2 F: FORCED REASON:
MEIHOD:
EXHIBIT G.- INSTRUCTIONS -
S: SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL FOR PREPARATION OF DATA B. MAINIENANCE OR TEST 2-MAIUAL SCRAM ENTRY SHEEIS FOR LICENSEE C. REFUELING
^3-AUIWATIC SCRAM EVENT Khtun (LER) FIIE D. REGULATORY RESIRICTION 4-00NTINUED
.. (NUREG-0161)
E. OPERATOR TRAINING A10 LICENSE EXAMINATION 5-REDUCED IDAD F. ADMINISTRATIVE 9-0IHER G. OPERATIONAL ERROR (EXPIAIN).-
H. OTHER (EXPLAIN)
O v
r 3
,~.
..v.-a
.m. E
,,i,,_
,m,'
m, y
f',[.;;;
., c l
NEW YORK POWER AUTHORITY-JAMES A. FTIZPATRICK NUCLEAR. POWER PLANT NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE-j
' FOR-THE MONTil 0F: OCTOBER 1989 The.FitzPatrick plant returned to service on October 7, 1989,'and operated at near full thermal power for the balance of'the reporting period.
The_ major safety _related-maintenance for the month was:
.1..
Repl' aced 17 control rod drive mechanisms; 2.
Performed preventive maintenance on various safety related valv.e operators >
3.
Performed wel'd overlays on' core spray piping:
4..
Performed. thermal performance testing on safety relatsd, area unit' coolers
'5.
Cleaned and flushed crescent area unit cooler' T
166UC-22J 6.
Modified " " standby gas treatment fans'and 7.-
Performed scheduled surveillance testing on various safety related instruments.