Monthly Operating Rept for Oct 1989 for Ja FitzPatrick Nuclear Power Plant
ML19332C932
Person / Time
Site: FitzPatrick 
Issue date: 10/31/1989
From: Jackie Cook
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML19332C007 List:
References
NUDOCS 8911290192
Download: ML19332C932 (4)


Text

1

~

~

7gg em.

1 j

6H'(~,;

.NEW YORK POWER AUD10RITY 1 JAMES A.- FITZPATRICK NUCLEAR POWER FIANT tT e.V!

0PERATING DATA REPOKr 4

3 L

DOCKET NO:~50-333:

J INIT NAME FITZPATRICK DATE NOVEMBER 1989

m COMPLETED BY
JOHN'000K TELEPHONE '(315)-349-6569

~

' OPERATING STATUS-i cl q LNIT NAME:

FITZPATRICK-NOTES 2..

REPORTING m IOD: 891030 891031 J3. 2 LICEtEED THERMAL POWER (MRI):

2436 24 :

NAMEPLATE RATING-(GROSS MWE):

883

? 5.':

DESIW ELECTRICAL RATING. (NET NE):

816-

. 6 ~. -

MAXIMLN DEPENDABLE CAPACITY (GROSS LEE):

785 i

17.

MAXIMLN DEPENDABLE CAPACITY (NET IWE):

757 p

8.

-IF CHANGES 00 CUR IN CAPACITY RATINGS -(ITEMS 3 - 7) SINCE IAST REPORT,- GIVE RFASONSr-e 19; POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET LEE):

l 10.~

REASONS FOR RESTRICTIONS, IF ANY:

THIS lONTH YR-10-DATE CUMULATIVE fil.

HOURS IN REPORTING PERIOD.--

745:

'7296 125041

' 212 NIEBER OF HOURS REACIOR WAS CRITICAL =.

628.5 6825.1 92538.4 L.

E13.

REACIOR RESERVE SHUTDOWN HOURS.

0 0

0

14; HOURS GENERA 10R ON-LINE.

578. t>

6772.4 89971.6

15.

UNIT RESERVE SHUTDOWN HOURS.

0 0

0 l'

16.

GROSS THERMAL ENERGY GENERATED (MWH).

1315824 16222320 196819564

17. -

GROSS ELECTRICAL ENERGY GENERATED (IMI).

445320 5523000 67207560 l.

.18..

NET ELECTRICAL ENERGY GENERATED (MWH).

430765 5334820 64470165

~

' 19.1 UNIT SERVICE FACIOR..

77.7 92.8 72.0 L

20.' -

UNIT AVAILABILITY FACIOR.

77.7 92.8 72.0 f21 UNIT CAPACITY FACIOR (USING MDC NET).

76.4-96.6 66.4

'22..

UNIT CAPACITY FACIOR (USING DER NET).

70.9 89.6

-63.2 c23.-

UNIT FORCED OLTfAGE RATE.

O 0

10.2

'24.

SHUIDOWNS SCHEDULED OVER NEXT 6 FDNTHS (TYPE, DATE AND DURATION OF EACH):

REFUEL OUTAGE SCHEDULED FOR MARCH 31,1990,10 IAST APPROXIMATELY 50 DAYS J25..

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

126.

' UNITS IN TEST STATUS (PRIOR TO CatNERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY C0tHERCIAL OPERATION 8911290192 091109 f

PDR ADOCK 05000333

,R; PDR 1

n

'e s

y; 3;;

pr 5NEW YORK ^ POWER.-hUTHORITY x,-[ * -

<-JAMESiAi;FITZPATRICK NUCLEAR POWER PLANT-

. AVERAGE DAILY UNIT" POWER LEVEL

.w DOCKET NO::50-333 UNIT: FITZPATRICK

-DATE:. NOVEMBER-1989 COMPLETED BY:" JOHN COOK 4

TELEPIONE: -(315)349-6569 :-

lONDis. OCTOBER 1989~

g.

0 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL Mie NET IWe }ET

-1 0

17 804 2'

0 18 805:

A

-3 0

19 805 4

0 20 807 5

0' 21 806 6'

0 22 805

'7 6

23 805

.i q

'. 8.

L 129 24 804 j

9 263-25 806 110:

687 26 805 0

11-:

741 27 805-12-

'786 28 805 13 804-29 838-14 804-30

-805 15 805 31 805 161 804:

.SU44ARY: The unit returned to service on October 7,1989, and operated at near full themal pwer for the remainder of the reporting period.

4 4

h 5

y,.

,. m

[_

~.

NIE YORK POWER AUIHORITY

^

DOCKET'NDr 50-333:-

^^ UNIT NAMEO FITZPATRICK -

<d JAMES A. FITZPATRICK NUCLEAR POWER PLANT MTE: NOVEMBER'19895 -

UNIT SHUIDOWNS REPORT.

~

03fLETED BY:JJ015 00Gt.

Ridun M)NDI: OCIDBER 1989 '

TELEPHONE:: (3,15)349-6569j m

^C D:

U"

~

C C

CAUSE AND 00 ERECTIVE ACTION R

AU-A~

SHUTTING LICENSEE S 0:

P O

-TO NO-DATE TYPE

T R ~

S DOWN EVENT TD

'OD PREVENT RECURRENCE IS O

THE REPORT

.E E N. E.

-0' N

REACIOR

,M

.E' N

T 4

891001 S

166.4 B

1 N/A N/A

~N/A' SHUrDOWN FOR 00NIROL ROD DRIVE MAINTENAtCE

'(ctmulative hours 523.7)~

3-4 1

2 F: FORCED REASON:

MEIHOD:

EXHIBIT G.- INSTRUCTIONS -

S: SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL FOR PREPARATION OF DATA B. MAINIENANCE OR TEST 2-MAIUAL SCRAM ENTRY SHEEIS FOR LICENSEE C. REFUELING

^3-AUIWATIC SCRAM EVENT Khtun (LER) FIIE D. REGULATORY RESIRICTION 4-00NTINUED

.. (NUREG-0161)

E. OPERATOR TRAINING A10 LICENSE EXAMINATION 5-REDUCED IDAD F. ADMINISTRATIVE 9-0IHER G. OPERATIONAL ERROR (EXPIAIN).-

H. OTHER (EXPLAIN)

O v

r 3

,~.

..v.-a

.m. E

,,i,,_

,m,'

m, y

f',[.;;;

., c l

NEW YORK POWER AUTHORITY-JAMES A. FTIZPATRICK NUCLEAR. POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE-j

' FOR-THE MONTil 0F: OCTOBER 1989 The.FitzPatrick plant returned to service on October 7, 1989,'and operated at near full thermal power for the balance of'the reporting period.

The_ major safety _related-maintenance for the month was:

.1..

Repl' aced 17 control rod drive mechanisms; 2.

Performed preventive maintenance on various safety related valv.e operators >

3.

Performed wel'd overlays on' core spray piping:

4..

Performed. thermal performance testing on safety relatsd, area unit' coolers

'5.

Cleaned and flushed crescent area unit cooler' T

166UC-22J 6.

Modified " " standby gas treatment fans'and 7.-

Performed scheduled surveillance testing on various safety related instruments.