Revised Monthly Operating Rept for Sept 1989 for Ja FitzPatrick Nuclear Power Plant,Reflecting Change in Net Electric Energy Generated
ML19332C931
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/30/1989
From: Jackie Cook
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML19332C007 List:
References
NUDOCS 8911290191
Download: ML19332C931 (1)


Text

=

7 u,

>' g "

lNEW WRK POWER AUIHORITY

)

c' 4,

^

-JAMES A. FITZPATRICK-NUCLEAR POWER PIANT

    • i

' OPERATING DATA REIORT l

p.

-q DOCKET NO: 50-333' UNIT NAME FITZPATRICK DATE OCIDBER 1989 COMPLETED BY ^ JOHN COOK.

/'>

TELEPHONE '(315) 349-6569 OPERATING' STATUS a

g1 e

UNIT NAME:

IFITZPATRICK.

NOTES D

l'.

l 2. ;. REPORTING PERIOD:- 890901 - 890930s

.'

  • 23,

. LICENSED THERMAL POWER; 0WI):

-2436

~

4.1 NAMEPLATE RATING-(GROSS NWE):-

883-1 1

5 ~' : DESIGN ELECIRICAL RATING (NET IWE):

816

~

( s6(, MAXIMLM DEPENDABLE CAPACITY (GROSS MWE):

785 f : 7..

MAXIMUM DEPENDABLE CAPACITY (NET MWE):.

757

^8;.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASONS:

E 1

9..

POWER IIVEL 10 WHICH RESTRICTED, IF ANY (NET !WE):

E 10.1 REASONS FOR RESTRICTIONS, IF ANY:

THIS MONIH YR-10-DATE CIEUIATIVE f

t til.:

HOURS IN REPORTING PERIOD'.!

720~

6551-

'124296-12.-

NLMBER OF HOURS REACIOR WAS CRITICAL, 365.6 6196.6 91909.9-13t :REACIOR RESERVE SHUTDOWN HOURS.

0 0

~0

<14.

HOURS GENERAIDR ON-LINE.

362.8 6193.8 89393.0 15.

UNIT RESERVE SHUTDOWN HOURS.

0 0

0

?16.

GROSS THERMAL ENERGY GENERATED (MWH).

869640 14906496 195503740 i

l.

117.

GROSS'ELECIRICAL ENERGY GENERATED (MWH).

291460 5077680 66762240-L

.'18.

NET ELECIRICAL' ENERGY GENERATED (MWR).

281870 4904055s 64039400 19.

UNIT SERVICE FACIOR.-.

50.4 94.5 71.9 1

20. : - UNIT AVAIIABILITY FACIOR.

50.4 94.5 71.9 L

21.-

UNIT CAPACITY FACIOR (USING MDC NET).

51.7-98.9 66.4

' 22.

UNIT CAPACITY FACIOR (USING DER NET).

48.0 91.7 63.1-23.

UNIT FORCED OUIAGE RATE.

0 0-10.3

-24.:

SHUrDOWNS SCHEDULED OVER NEXT 610NTHS (TYPE, DATE AND DURATION OF EACH):

REFUELING OUfAGE SCHEDULED FOR MARCH 31, 1990 70 LAST APPROXIMATELY 50 DAYS.

l q

25.-

IF SHUR DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

OCI0BER 5,1989

. 26.-

UNITS IN TEST STATUS (PRIOR 70 0@HERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CPlTICALITY INITIAL ELECTRICITY COMERCIAL OPERATION

'h bh

[

't R_

.