Text
I 1
.
(/
purg
.
'o
UNITED STATES
(
, 8
l,i
NUCLEAR R85GULATORY COMMISSION
$
f
REGION V
g
g
1990 N. CALIFORNIA BOULEVARD
D
SUITE 202, WALNUT CREEK PLAZA
% * , , * ,o
WALNUT CREEK, CALIFORNIA 94596
JUN 2 61920
" ? r$.II '!h ) G[j L y! p q
p.!y hp . . - -
Docket Hos. 50-460
i
m
50-513
isk [ v .
yl
t
Washington Public Power Supply System
P. O. Box 968
Richland, Washington 99352
Attention: Mr. N. O. Strand
Managing Director
Gentlemen:
Subject: NRC Inspection at Washington Nuclear Projects 1 and 4
This refers to the inspection conducted by Mr. A. Toth of this office
during the period of April 1-30, 1980, of activities authorized by
NRC Construction Permit Nos. CPPR-134 and -174, and to the discussion
of our findings held by Mr. Toth with Mr. T. Houchins and other members
of your staff on April 7,14, 21 and 28,1980.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance has been categorized into a level as described
i
in our correspondence to all NRC licensees dated December 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201,
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office,
-
within thirty (30) days of your receipt of this notice, a written
statement or explanation in reply including (1) corrective steps which
l
have been taken by you and the results achieved; (2) corrective steps
which will be taken to avoid further violations; and (3) the date when
full compliance will be achieved.
I fr ' ' ' j
-
f , fi?
wouw} . % ,,
,
u d. 7 , g.
.
g
- -
t
,8009110' yp
_
"
~
i
.
,,
,
.
.
_
4
'
N; 0. Strand
2-
-
.
In accordance with Section'2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will se placed in the NRC's Public
Document Room. . If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
- .
_ to this office, within 30 _ days of the date of this letter, requesting
that such information be withheld from public disclosure. The applica-
tion must include a full statement of the reasons why it is claimed that
the information is proprietary. The application should be prepared so
that any proprietary information identified is contained in an enclosure
.
to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you.
in this regard within the spc'cified period, the report will be placed
!
in the Public Document Room.
4
Should you have any questions concerning this inspection, we.will be
glad to discuss them with you.
Sincerely,
,
,
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
i
Enclosures:
A.
B.
IE Inspection Report
No. 50-460/80-07
50-513/80-07
cc w/o Enclosure B:
.'
M. E. Witherspoon,- Division Manager
l
Quality Assurance, WPPSS
J. P. Thomas, Project Manager, WPPSS
<