Forwards IE Bulletin 80-07,Suppl 1, BWR Jet Pump Assembly Failure. No Response Required
ML19331E185
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/13/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8009090055
Download: ML19331E185 (1)


Text

(

1

/

'o,,

UNITE] STATES 8

NUCLEAR REGULATORY COMMISSION o

3 E

REGION 11 101 MARIETTA ST., N.W., SUITE 3100 l

o ATLANTA, GEORGIA 30303 In Reply Refer '.'o:

MAY 131980 RII:JPO O'35f]

0-324 /

Carolina Power and Light Company Attn: / J. A. Jones Senior Executive Vice President and Chief Operating Officer 411 Fayetteville Street Raleigh, NC 27602 Gentlemen:

Enclosed is IE Bulletin No. 80-07, Supplement No. 1, which specifies the NRC offices that should receive written reports submitted in response to this Bulletin.

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely, S E

%.(}; &,, +,f James P. O'Reilly Director l

Enclosures:

1.

IE Bulletin No. 80-07, Supplement No. 1 2.

List of IE Bulletins Recently Issued O

e

"*09090 Oq5

I-MAY t a 1980 Carolina Power and

>'Y Light Company cc w/ encl:

A. C. Tollison, Jr.

Plant Manager Box 458 Southport, North Carolina 28461 O

k 0

v

.A m--

-aw-,,.

.,m,w--

we

_%w---

e---

SSINS No.: 6820 uj Accession No.:

UNITED STATES 8005050055 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555

-r-May 13, 1980 i

IE Bulletin No. 80-07 Supplement No. 1 BWR JET PUMP ASSEMBLY FAILURE s

C.

Reporting Requirements The information in Items A.3, and B.1, is requested under the provisions of 10 CFR 50.54(f). -Accordingly you are requested to provide within the time periods specified in these items, written statements of this informa-tion, signed under oath or affirmation.

These reports should be submitted to the Director of the appropriate NRC Regional Office and a copy should be forwarded to the NRC Office of Inspection and Enforcement, Divir ton of Reactor Operations Inspection, Washington, D.C.

20555.

Approved by GAO, B180225 (R0072); clearance expires 7-31-80.

Approval was given under a blanket clearance specifically for identified generic problems.

i

.]A-wsh q M eye'Ge

  • Are he p-M4 #a p.--m.

4-47 F-

,P 7

9 c.

y w-.--

p.~

'-&-V

IE Bulletin No. 80-07 Enclosure g

Supplement No. 1 May 13, 1980 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To-No.

80-07 BWR Jet Pump Assembly 5/13/80 All GE BWR-3 & BWR-4 Suppl. 1 Failure reactor facilities with an OL 80-13 Cracking In Core Spray 5/12/80 All BWR's with an Spargers OL 80-12 Decay Heat Removal System 5/9/80 Each PWR with an GL Operability 80-11 Masonry Wall Design 5/8/80 All power reactor facilities with an OL, except Trojan 80-10 Contamination of 5/6/80 All power reactor Nonradioactive System and facilities with an Resulting Potential for OL or CP Unmonitored, Uncontrolled Release to Environment 80-09 Hydramotor Actuator 4/17/80 All power reactor Deficiencies operating facilities and holders of power reactor construction permits 80-08 Examination of Containment 4/7/80 All power reactors with Liner Penetration Welds a CP and/or OL no later than April 7, 1980 i

80-07 BWR Jet Pump Assembly 4/4/80 All GE BWR-3 and Failure BWR-4 facilities with an OL 80-06 Engineere'd Safety Feature 3/13/80 All power reactor (ESF) Deset Controls facilities with an OL 80-05 Vactum Condition Resulting 3/10/80 All PWR power reactor In Damage To Chemical Volume facilities holding i

Control System (CVCS) Holdup OLs and to those with Tanks a CP 79-01B Environmental Qualification 2/29/80 All power reactor of Class IE Equipment facilities with an OL 80. Analysis of a PWR Main 2/8/80 All PWR reactor' facilities Steam Line Bresa With holding OLs and to those 4-Continued Feedwater nearing licensing Addition

?