ML19329B153
| ML19329B153 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 10/20/1976 |
| From: | Jordan E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19329B143 | List: |
| References | |
| NUDOCS 8001300726 | |
| Download: ML19329B153 (2) | |
See also: IR 05000346/1976018
Text
.
UNITEo STATES
k
N
NUCLEAR REGULATORY COMMISSION
g
,
,
REGloN lli
CLEN ELLYN, lLLINot5 40137
OCT 2 01976
Toledo Edison Company
Dockat No. 50-346
ATTN: Mr. Lowell C. Roe
Vice President
Facilities Development
Edison Plaza
300 Madison Avenue
Toledo, Ohio
43652
M
Gentlemen:
)
i
This refers to the inspection conducted by Messrs. F. J. Jablonski and
i
K. R. Naidu of this office on September 21-23, 1976, of activities at
Davis-Besse Nuclear Power Station, Unit 1, authorized by NRC Construction
Permit No. CPPR-80 and to the discussion of our findings with Mr. E. C.
)
Novak and others of your staff.
A copy of our report of this inspection is enclosed. This principal
area avamin=d during this inspection was the results to date of your
reinspection of electrical installations as discussed in our letter
dated May 30, 1975. Within this area and the other areas ar==in=d , the
inspection consisted of a selective av==ination of procedures and
representative records, observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in
noncompliance with NRC requirements, as described under F.nforcement
Items in the Summary of Findings section of the enclosed inspection
report.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice, Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office within
thirty days of your receipt of this notice a written statement or explan-
scion in reply, including for each item of noncompliance: (1) corrective
action taken and the results achieved; (2) corrective action to be taken
to avoid further noncompliance; and (3) the date when full compliance
will be achieved.
-1
060T104
,
h
O'c
i
,
e
v
%
1,,
j
80018007K6
- 276 WN
, -
.~
.
. -
-
_ . _ _ , _ _ _
._
__
__-
.
.
Toledo Edison Company
-2-
0CT 2 01976
Certain other activities, set forth under Other Significant Items in the
Susmary of F4nMass section of the enclosed inspection report, appear to
be a deviation from certain guides, codes and meandards which have been
endorsed by the Coimaission. Please advise us in writing within thirty
days of the corrective action you have taken or plan to taka, showing
the estimated date of completion with regard to this deviation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2 Title 10, Code of Federal Regulations, a copy of this notice, the
enclosed inspection report, and your response to this notice will be
placed in the NRC's Public Document Room, except as follows.
If this
report contains information that you or your contractors believe to be
proprietary, you must apply in writing to this office, within twenty
"
days of your receipt of this notice, to withhold such information from
public disclosure. The application must include a full statement of the
reasons for which the information is considered proprietary, and should
be prepared so that proprietary information identified in the application
is contained in an enclosure to the application.
We will gladly discuss any questions you have concerning this inspection.
Sincerely yours,
.
E. L. Jordan, Acting Chief
Reactor Construction and
1
'
Engineering Support Branch
Enclosure:
IE Inspection Report
No. 050-346/76-18
bec w/ enc 1:
Central Files
Reproduction Unit NRC 20b
Local PDR
U. Young Park, Power
Siting Conmission
l
0
-