Forwards IE Insp Rept 50-346/76-18 on 760921-23 & Notifies of Violation
ML19329B153
Person / Time
Site: Davis Besse 
Issue date: 10/20/1976
From: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B143 List:
References
NUDOCS 8001300726
Download: ML19329B153 (2)


See also: IR 05000346/1976018

Text

.

UNITEo STATES

k

N

NUCLEAR REGULATORY COMMISSION

g

,

,

REGloN lli

799 ROOSEVELT RO AD

CLEN ELLYN, lLLINot5 40137

OCT 2 01976

Toledo Edison Company

Dockat No. 50-346

ATTN: Mr. Lowell C. Roe

Vice President

Facilities Development

Edison Plaza

300 Madison Avenue

Toledo, Ohio

43652

M

Gentlemen:

)

i

This refers to the inspection conducted by Messrs. F. J. Jablonski and

i

K. R. Naidu of this office on September 21-23, 1976, of activities at

Davis-Besse Nuclear Power Station, Unit 1, authorized by NRC Construction

Permit No. CPPR-80 and to the discussion of our findings with Mr. E. C.

)

Novak and others of your staff.

A copy of our report of this inspection is enclosed. This principal

area avamin=d during this inspection was the results to date of your

reinspection of electrical installations as discussed in our letter

dated May 30, 1975. Within this area and the other areas ar==in=d , the

inspection consisted of a selective av==ination of procedures and

representative records, observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described under F.nforcement

Items in the Summary of Findings section of the enclosed inspection

report.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice, Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office within

thirty days of your receipt of this notice a written statement or explan-

scion in reply, including for each item of noncompliance: (1) corrective

action taken and the results achieved; (2) corrective action to be taken

to avoid further noncompliance; and (3) the date when full compliance

will be achieved.

-1

060T104

,

h

O'c

i

,

e

v

%

1,,

j

80018007K6

  1. 276 WN

, -

.~

.

. -

-

_ . _ _ , _ _ _

._

__

__-

.

.

Toledo Edison Company

-2-

0CT 2 01976

Certain other activities, set forth under Other Significant Items in the

Susmary of F4nMass section of the enclosed inspection report, appear to

be a deviation from certain guides, codes and meandards which have been

endorsed by the Coimaission. Please advise us in writing within thirty

days of the corrective action you have taken or plan to taka, showing

the estimated date of completion with regard to this deviation.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2 Title 10, Code of Federal Regulations, a copy of this notice, the

enclosed inspection report, and your response to this notice will be

placed in the NRC's Public Document Room, except as follows.

If this

report contains information that you or your contractors believe to be

proprietary, you must apply in writing to this office, within twenty

"

days of your receipt of this notice, to withhold such information from

public disclosure. The application must include a full statement of the

reasons for which the information is considered proprietary, and should

be prepared so that proprietary information identified in the application

is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely yours,

.

E. L. Jordan, Acting Chief

Reactor Construction and

1

'

Engineering Support Branch

Enclosure:

IE Inspection Report

No. 050-346/76-18

bec w/ enc 1:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

U. Young Park, Power

Siting Conmission

l

0

-