[bl3 n-c:a-as v.
U G.
FES 281977 Docket No. 50-346 j
.c v
I MEMORANDlM FOR:
R. F. Heishman. Chief, Reactor Construction and
- r
~
~ =' Engineering Support Branch,'RIII, i
FROM:
K. V. Seyfrit. Chief, Reactor Technical Assistance Branch,IE~
j
SUBJECT:
DAVIS BESSE UNIT NO.1 - SUPPORT OF CONTROL AND
- ' INSTRUMENT CABLES ROUTED IN VERTICALLY INSTALLED
~;
f CONDUIT (AITS F30248Hl)
'~d s
j This. memorandum confi ms the technical guidance provided to D. W. Hayes l
of your office during the telecon with me on February 8,1977.
Region III through AITS F30248H1 requested headquarters assistance in the O
asta<c= ant of the validity of the action taken by this licensee to con-form to the requirements specified in Section 300-19 of the 1971 National Electric Code (NEC) regarding electrical cables installed in vertical
~
raceways. At this facility, the licensee is casuritted to use the NEC for Class IE cable design and installation.
During a special~ electrical-inspection the NRC inspector noted that instrumentation and control cables routed in vertical conduit risers did not-===maan to the~ criteria specified in Section 300-19 of the NEC.
Section 300-19 requires that "... a cable support shall be provided at -
or near the top of the vertical raceway, plus a-support'for och interval _
df spacing as. specified in Table 300-19(a)."
~
lE71censee's corrective action-was ~t6. revise their Cable / Conduit Instal-1&Uos Specification No. 7749-E-14. This document provides installation
.. procedures for conduit, raceways, cables, and cable supports in vertical
~
conduit risers. - Details of the specific changes made to Specification 7749-E-14 are presented. in the enclosed letter from the Licensee to RIII g j
. dated November 24,1976, Serial No. 160.
p #37 a
RTAB has reviewed this matter and has concluded 'that the revisions p
are appropriate and do not conflict with the intent of NEC Section
- J3 300-19.
Furtherinore, we believe the revised cable installation design is acceptable for support of instrumentation / control cables installed in vertical conduit as described in your memorandici and further described in the Licensee's letter dated Nobember-24,1976 to Mr. Keppler.
~
o,,,cGQNTACT:
V. D. Thomas 8.0.0..).3 0 0 7.A.I
.iu=mm.
me. gem
.e
\\
~
?. -
~.
V.
M R. F. Heishman 2 ~
FEB281977 In our opinion.- the licensee's requirement which calls for a cable restraint on either instrumentation or control cables which are over 20 feet in length in the vertical and terminated at the upper and exceeds the requirements,of Section 300-19 of the NEC.
In this application, the cable-restraint is primarily for the purpose of l
termination protection and not related to conductor tension strain.
On the basis of our review and discussions' held wit $ Bechtel. Gaithersburg on this issue, we consider the matter closed and plan no further action i
- on it unless requested.
c
~
l
~
.~
~
i
.y
' K. V. Seyfrit, Chief Reactor Technical Assistance Branch
,v Office of Inspection and Enforcement
Enclosure:
O
~
Ltr., Lowell E. Roe, TECO to James G. Kappler,.RIII, dd.
j 1
11/24/76
~
~
~
~
.,a
~
i
=
i O-
~
~ RIP:1086/F30248H1 or.c=;
RTA: RIP E...
RTA; RIP.:I l
VDThomas:sgh.. KVSeyfr.1 2/0)f77.;
2D$/77...
an.s
....;