Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-346/76-18. Requests Corrective Action for Inadequately Addressed Failure to Control Insp Status of Specified Installations
ML19329B150
Person / Time
Site: Davis Besse 
Issue date: 12/15/1976
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B143 List:
References
NUDOCS 8001300724
Download: ML19329B150 (2)


See also: IR 05000346/1976018

Text

, . , *

g

,

e

,

,

,

,

,.

.

UNITt0 STATES

.

,.

NUCLEAR REGULATORY COMMISSION

-_

!

REGloN til

/

799 ftOOSEVELT RoAo

CLEN ELLYN. ILLINOIS 60137

-

.

.

.

DEC 151976

Toledo Edison Company

Docket No. 50-346

-

ATTN:

Mr. Lowell E. Roe

l

Vice President

Facilities Development

,

Edison Plaza

300 Madison Avenue

Toledo, Ohio

43652

I

Gentlemen:

H

'

'

Thank you for your letter of November 24, 1976, in response to

our letter of October 20, 1976, relative to Inspection Report

No. 050-346/76-18.

We have reviewed your letter and find that

additional information is required relative to two of the items,

as discussed below.

Our review of the remaining item indicates

it has been satisfactorily addressed and your corrective action

will be examined during a subsequent inspection.

OQ

In regard to the enforcement item relating to Criterion XIV,

Appendix B,10 CFR Part 50, your response does not address the

problem as described in the Summary of Findings section of the

report but only the example contained in the Report Details.

Our concern is the failure to identify and control the inspection

status of structures, systems, and components during and after

. installation, so that inadvertent damage or injury is precluded.

Our inspection findings indicated that your electrical and instru-

mentation contractors do not have procedures implementing the

requirements of Criterion XIV.

Our review of Bechtel Power

'

Corporation procedure No. BCM-FAP-100, Revision 3, finds this

procedure to be consistent with Criterion XIV, however, the above

described contractors do not appear to have knowledge of this

procedura and are not fcllowing the procedural requirenents.

Please advise us, in writing, of the corrective action you have

l

taken, or pian to take, regarding this matter and the estimst.ed

l

date of completion of rhis corrective action.

$ $

'c,

1, N#kb)$

see d *

.

.

tryg,p

-

,

,

,-

.. . .

,

,

..

.

,

,

.

.

-

-

.

.

.

..

. p.

<

d

DEC 151976

Toledo Edison Company

2-

-

.

Concerning the deviation item, we acknowledge your position as

stated in your letter and during the discussions in our meeting

of December 2, 1976. Our position remains as described in the

inspection report.

We are referring this matter to our head-

quarters for review, and you will be informed of the results of

this review.

'

We will gladly discuss any questions you have concerning this matter.

Sincerely yours,

^#

-

pyL'w}u= es

,,,r

4

.

-

R. F. Heishman, Chief

Reactor Construction and

Engineering Support Branch

-

cc:

Mr. J. Evans

Davis-Besse, Station

Superintendent

O

cc w/1tr dtd 11/24/76:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

'

TIC

, U. Young Park, Power

Siting Commission

.

  • o

9

.

.

9

.

..