05000302/LER-1978-018-03, /03L-0:on 780316,instrumentation Functional Test Source Range Portion Not Performed within Specified Time Limit.Caused by Personnel Misinterpreting Tech Spec 1.12. Core Alteration Instructions Sent to All Personnel

From kanterella
(Redirected from ML19326A744)
Jump to navigation Jump to search
/03L-0:on 780316,instrumentation Functional Test Source Range Portion Not Performed within Specified Time Limit.Caused by Personnel Misinterpreting Tech Spec 1.12. Core Alteration Instructions Sent to All Personnel
ML19326A744
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/07/1978
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19326A743 List:
References
LER-78-018-03L, LER-78-18-3L, NUDOCS 8003030880
Download: ML19326A744 (2)


LER-1978-018, /03L-0:on 780316,instrumentation Functional Test Source Range Portion Not Performed within Specified Time Limit.Caused by Personnel Misinterpreting Tech Spec 1.12. Core Alteration Instructions Sent to All Personnel
Event date:
Report date:
3021978018R03 - NRC Website

text

.

i.

U. s. NUCLEAR REGULATORY cDemmiss30ss seaC Fosse 304 (1 711 LICENSEE EVENT REPORT EXHIBIT A CONTROL SLoCit: l l l l \\ l lh (PtgAsa pa:NT om TYPE ALL REcWiRGO iNFomedATIONI 0; 0l0 g go ;O g;4,1,1;l (l; g _g_ g g 0 l 01 g

I,a iil 171 LI q R) Pt 3 fg G I 01-t uCau. Coo.

.. w wCa a -...

a a uCa.. r... a

., a, s.

af co T ITTTl 7,"J LLJ@l o f Sio i -10i 30i 2 g,0 ; 3,1 g 6, 7; 8 g;0~,4 ; 0; 7,7 is lg 8

M

.8 30C.st % ?t48 4W E'e r sa rt 7.

35 AGPORT oaf t 80 aveNT ossemiarioN ANo eaosasta coussous=cas @

lDuring Mode 6 (refueling) ooeration. it was discovered that I

o 2 g ;the Source Range portion of the Instrumentation Functionai Tests l

,,g,,during refueling operations (SP-220) had not been performed

within the specified time limit, as required by Tech Spec o a

,,,.i i4.9.2(b).

No safety harard as Source Range Channels were io,,,; operable and available.

SP-220 was satisfactorily performed I

,,g,,on 16 March 1978. Eleventh occurrence of missed SP's.

t 004 4

53 I

C0v'Csis7:0:1

$tsC 08 c

Iz i zlO L,Aj@ L,ij@ i a z! zi zi z iz t@ W@ t.zj.'@

f.

ia m e

m 51CJE%11A4.

CC 48=T%C1 pIreg7 8(V813088

,,,Evgwfvgae ag*Cnf 40.

g veg go

@ lgge so 17I 8 I-I I0113SI W

10!3I IL I L. !

L.0J g;

u u

a a

T MN ?CWit o'.'#Rr SnWT'

.. n= ^. m:n'

.c'"?,'.

",'.".(?J' 4::Ta%

"^

LHJ@L.ZJG I Zi@

W@

I 01010 f6 ! L.YJ@

lNt@

l zi@

lzi91919!@

u u

o.

.a

.a cAuss erscaiarios vis c:matern a a..Ti.ss r i,,,,; The cause was due to personnel error in that Tech Spec 1.12

,,,,, pies mis-int erp re t e d.

All concerned personnel have been given

,,,,,, instructions by speed letter as to the definition of Core i,i3i 1 Alteration.

I wI f

'st'a'ME or-earvares @ 5's2:'NE'

s.:r.sav eis:=. [i O.:

leett @ @ 1 0 li=0lgt NA l J g Tech Spec t

review o cYrrent l

's

= **

4+

mode. is g(.,s, 7

avr.st:* a: nirv @ I

,c,,,,,,

NA L.

NA ' tocar.os os estass @

li 4* I L Mes e en.rasr' '

,....,s'd. 31 ens as 13 I

2, ".

fit 910'['510t@b@

A l

.... ssor.s,;i.,

s sa.+.cs@

li 6 1 l0.e&l= 0igl v

i NA P

9 7 "8," * [,h,';((,8 * ' @

li!il d,l NA I

$4 I : t - i b,)@i',','..,,.as @

Nac ust c'av NA n

! 11iiitrii!

't e

e e u

.s e,

.o

)

5-M 1

o o" a r

- exa savi ce,.ceaat=

//

(SEE ATTAClitD SU?PLE}!ENT.iRY INFOR1!ATION SHEET) g l

t-f '

E p

(

SUPPLEMENTARY INFORMATION x,/

1.

Report No.:

50-302 / 78-018 /03L-0 2.

Facility:

Crystal River Unit 13 3.

Report Date:

7 April 1978 4.

Occurrence Date:

16 March 1978 (discovered 17 March 1978) 5.

Identification of Occurrence:

Failure to perform required surveillance prior to Core Alterations as required by Tech Spec 4.9.2(b).

6.

Conditions Prior to Occurrence:

Mode 6 refueling.

7.

Description of Occurrence:

l At 1100 it was discovered that the Source Range Nuclear Instrumentation i

portion of the Instrumentation Functional Tests during Refueling Opera-tion Procedure (SP-220) had not been performed within eight (S) hours prior to Core Alteration.

It was determined that SP-220 should have been performed prior to the time of plenum removal as defined by Tech Spec 1.12. An investigation of this event revealed that the Tech Spec definition of " Core Alteration" was mis-interpreted to mean fuel move-ment only.

Plenum removal was accomplished during 0000/0080 shift on 16 March 1978 and SP-220 was satisfactorily performed at 0900 on 16 March 1978 and met the criteria of eight (8) hours prior to fuel movement.

8.

Designation of Apparent Cause:

The cause of this event was due to personnel error in that the defini-tion of Tech Spec 1.12 " Core Alteration" was interpreted to exclude plenum movement.

9.

Analysis of Occurrence:

There was no safety hazard to the plant or general public as the Source Range Nuclear Instrumentation Functional Test was satisfactorily performed.

(Source Range channels were completely functional prior-to and during the plenum removal.)

10.

Corrective Action

All concerned personnel have been given instructions as to the defini-tion of Core Alteration by speed letter.

11.

Failure Data:

(

Missed Surveillance Procedures have been a recurring problem, however,

\\'

this is the ficst occurrence of an event of this nature.