Text
- n
'
{d
X
,
gm n
'
00T 261989
'
i.
,
,
n
(i
n
Docke; hicense Nos.: 50-317/0PR-53
50 318/DPR-69
Ba'
more Gas ant; Electric Company
<
L
AT . .. . Mr. George C. Creel
E'
.
. Vice President, Nuclear Energy
Calvert Cliffs Nuclear fower Plant
MD Routes 2 and 4
Post Office Box'3.535
Lusby, Maryland 20657
Gentlemen:-
Subject: NRC Region I Combined Inspection Report Nos. 50-317/89-18 and
50-318/89-19
This transmits the July 4 - August 28, 1989, resident inspection findings- by:
W. V. Dritchett and others at the Calvert Cliffs Nuclear Power Plant, Lusby,
"
-Maryland. Those findings wert based on observation of activities, interviews,
-and document reviews, which hace been discussed with Mr. Russell of your.. staff.
,
Apparent violations of NRC requirements are cited in Appendix A and categorized
under the.NRC Enforcement Pa' icy, 10 CFR 2, Appendix.C. A reply is required in
accordance with Apper.cix
The ree,uirement that you reply is exempt from
clearance:by the Office of han. ement and Budget under the Paperwork Reduction
Act of 1980, PL SG-511'.
'
As of the conclusion of the inspection, we continued to observe events which
caused ceaccrns about your ability to identify, quantify and successfully
resolve potentially safety significant problems.
Events such as the ones
described in Sections 7.1 and 7.2 involving partial disabling of the Halon
systr..n ' for the switchgear rooms, a missed surveillance test' for the reserve
i
battery, overfill' of the reactor coolant system and. failure to properly test
)
i
the spent' fuel exhaust fans typify the types of problems that have been a
j
source of cencern to the NRC.
We recognize that the scope of corrective
actions expected to be implemented prior to restart of Unit 1 accommodate
i
these concerns.
However, the problems identified by your staff and .the NRC
!
emphasize the continuing need for management attention in the areas of adequacy
l
of procedures 'and
overall
coordination
and
direction
of
surveillance
{
programs.
l
.
,
$1$$ic Nh7
a
i
tt
h
l
0FFICIAL RECORD LOPY CIR CC 89-18/19 - 0001.0.0
g!f
"
.
10/25/89
,
I
.
--
- - ' - - -'
,T
'
.
.
L
.
.
Baltimore Gas and' Electric Company
2
00T 261989
[, '
,
.
.
"
Ycur cooperation with'us is appreciated.
Sincerely,
i
0:idas av.4 dy
'
James T. Wiggins
,
James T. Wiggins, Chief..
Reactor Projects Branch No. 1
Division of Reactor Projects
Enclosures:
-
< 1.
Appendix A, Notice of Violation
2.-
NRC Region 1 Combined Inspection Report Nos. 50-317/89-18 and 50-318/89-19
cc w/encis:
' J. Lippold, General Supervisor, Technical Services Engineering
I
7. Magette, Administrator, Nuclear Evaluations
j
Public Document Room (LPDR}
.
Local . Public Document. Room (LPDR)
'
L
Nuclear Safety Information Center (NSIC)
NRC-Resident Inspector
[
State of Maryland (2)
.bec w/encls:
,
Region I' Docket Room (with concurrences)
Management Assistant, DRMA (w/o encis)
J. Wiggins, DRP-
L. Tripp, DRP
,
D. Limroth, DRP
K. Abraham, PA0
.
'M..Callahan, GPA/CA
'
.R. Capra, NRR
'
t -
S. McNeil, NRR
Resident Inspector - Calvert Cliffs
,
7 R1
I
P
I:DRP
mroth/mjd
pPritchett
LTripp
JWiggins
'
10/8h89
l
l'
10/Ay89
10/$'/89
10/243'89
0FFICIAL RECORD COPY CIR CC 89-18/19 - 0002.0.0
10/25/89
.
.