Forwards Insp Repts 50-317/89-18 & 50-318/89-19 on 890704- 0828 & Notice of Violation.Nrc Observed Events That Caused Concerns Re Licensee Ability to Identify,Quantify & Successfully Resolve Potentially safety-significant Problem
ML19324B744
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/26/1989
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19324B745 List:
References
NUDOCS 8911080133
Download: ML19324B744 (2)


See also: IR 05000317/1989018

Text

n

'

{d

X

,

gm n

'

00T 261989

'

i.

,

,

n

(i

n

Docke; hicense Nos.: 50-317/0PR-53

50 318/DPR-69

Ba'

more Gas ant; Electric Company

<

L

AT . .. . Mr. George C. Creel

E'

.

. Vice President, Nuclear Energy

Calvert Cliffs Nuclear fower Plant

MD Routes 2 and 4

Post Office Box'3.535

Lusby, Maryland 20657

Gentlemen:-

Subject: NRC Region I Combined Inspection Report Nos. 50-317/89-18 and

50-318/89-19

This transmits the July 4 - August 28, 1989, resident inspection findings- by:

W. V. Dritchett and others at the Calvert Cliffs Nuclear Power Plant, Lusby,

"

-Maryland. Those findings wert based on observation of activities, interviews,

-and document reviews, which hace been discussed with Mr. Russell of your.. staff.

,

Apparent violations of NRC requirements are cited in Appendix A and categorized

under the.NRC Enforcement Pa' icy, 10 CFR 2, Appendix.C. A reply is required in

accordance with Apper.cix

The ree,uirement that you reply is exempt from

clearance:by the Office of han. ement and Budget under the Paperwork Reduction

Act of 1980, PL SG-511'.

'

As of the conclusion of the inspection, we continued to observe events which

caused ceaccrns about your ability to identify, quantify and successfully

resolve potentially safety significant problems.

Events such as the ones

described in Sections 7.1 and 7.2 involving partial disabling of the Halon

systr..n ' for the switchgear rooms, a missed surveillance test' for the reserve

i

battery, overfill' of the reactor coolant system and. failure to properly test

)

i

the spent' fuel exhaust fans typify the types of problems that have been a

j

source of cencern to the NRC.

We recognize that the scope of corrective

actions expected to be implemented prior to restart of Unit 1 accommodate

i

these concerns.

However, the problems identified by your staff and .the NRC

!

emphasize the continuing need for management attention in the areas of adequacy

l

of procedures 'and

overall

coordination

and

direction

of

surveillance

{

programs.

l

.

,

$1$$ic Nh7

a

i

tt

h

l

0FFICIAL RECORD LOPY CIR CC 89-18/19 - 0001.0.0

g!f

"

.

10/25/89

,

I

.

--

- - ' - - -'

,T

'

.

.

L

.

.

Baltimore Gas and' Electric Company

2

00T 261989

[, '

,

.

.

"

Ycur cooperation with'us is appreciated.

Sincerely,

i

0:idas av.4 dy

'

James T. Wiggins

,

James T. Wiggins, Chief..

Reactor Projects Branch No. 1

Division of Reactor Projects

Enclosures:

-

< 1.

Appendix A, Notice of Violation

2.-

NRC Region 1 Combined Inspection Report Nos. 50-317/89-18 and 50-318/89-19

cc w/encis:

' J. Lippold, General Supervisor, Technical Services Engineering

I

7. Magette, Administrator, Nuclear Evaluations

j

Public Document Room (LPDR}

.

Local . Public Document. Room (LPDR)

'

L

Nuclear Safety Information Center (NSIC)

NRC-Resident Inspector

[

State of Maryland (2)

.bec w/encls:

,

Region I' Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

J. Wiggins, DRP-

L. Tripp, DRP

,

D. Limroth, DRP

K. Abraham, PA0

.

'M..Callahan, GPA/CA

'

.R. Capra, NRR

'

t -

S. McNeil, NRR

Resident Inspector - Calvert Cliffs

,

7 R1

RP

I

P

I:DRP

mroth/mjd

pPritchett

LTripp

JWiggins

'

10/8h89

l

l'

10/Ay89

10/$'/89

10/243'89

0FFICIAL RECORD COPY CIR CC 89-18/19 - 0002.0.0

10/25/89

.

.