ML19323G732

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/79-55 on 791210-14 and Notice of Violation
ML19323G732
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/28/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19323G731 List:
References
NUDOCS 8006060564
Download: ML19323G732 (2)


See also: IR 05000302/1979055

Text

, - -

.-.

. . . - . .._ .- . - li: .L.

.L

-

i.

ur

Q

4,,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

o

$

E

REGION 11

'

'#

o

101 MARIETTA ST., N.W SUITE 3100

l

ATLANTA, GEORGIA 30303

.....

MAR 2 81980

In Reply Refer To:

RII:DRQ

50-302/79-55

Flori a Power Corporation

ATTN:

J. A. Hancock, Director

Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the inspection conducted by D. R. Quick of this office on December 10

through 14, 1979 of activities authorized by NRC Operating License No. DPR-72 for the

!

Crystal River facility, and to the discussion of our findings held with D. C. Poole

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed

inspection report. Within these areas, the inspection consisted of selective exam-

inations of procedures and representative records, interviews with personnel, and

observations by the inspector.

We have examined actions you have taken with regard to previously reported unre-

solved items.

The status of these items is diseassed in the enclosed report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliacce; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter end the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the app 1! cation is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

8006060 d

G

5

-

- - ~ . - - - - . . . - . . - - - . . . .

. .

..

-

'

.

.

)

j

Florida Power Corporation

-2-

MAR 2 81980

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

g. C.

R. C. L wis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/79-55

cc w/ enc 1:

D. C. Poole

Nuclect Plant Manager

P. O. Box 1240

Crystal River, FL 32629

.