ML19323E863
| ML19323E863 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 03/10/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Dunn C DUQUESNE LIGHT CO. |
| Shared Package | |
| ML19323E857 | List: |
| References | |
| NUDOCS 8005270333 | |
| Download: ML19323E863 (2) | |
See also: IR 05000334/1979027
Text
_ _ _ _ _
_ _ _ _ _ _ _ _
_ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _
.#
%,
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
g
s'
REG lONl
%
I
631 PARK AVFNUE
\\
h
&
KING OF PRUSSIA. PENNSYLVANIA 19406
.....
MAR 10 1980
Docket No. 50-334
Duquesne Light Company
ATTN:
Mr. C. N. Dunn
Vice President
Operations Division
435 Sixth Avenue
Pittsburgh, Pennsylvania 15219
Gentlemen:
Subject:
Inspection No. 50-334/79-27
This refers to the inspection conducted by Mr. D. A. Beckman of this office on
December 19, 1979 through January 11, 1980, at the Beaver Valley Power Station,
Unit 1, Shippingport, Pennsylvania of activities authorized by NRC License No.
DPR-66 and to the discussions of our findings held by Mr. Beckman with Mr. J. A.
Werling and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that certain of your activi-
ties were not conducted in full compliance with NRC requirements, as set forth
in the Notice of Violation, enclosed herewith as Appendix A.
These items of
l
,
noncompliance have been categorized into the levels as described in our corre-
I
spondence to you dated December 31, 1974.
This notice is sent to you pursuant
to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to
this office, within twenty (20) days of your receipt of this notice, a written
statement or explanation in reply including:
(1) corrective steps which have
,
been taken by you and the results achieved; (2) corrective steps which will be
{
taken to avoid further items of noncompliance; and (3) the date when full com-
,
1
pliance will be achieved.
-
3
With respect to Appendix A, we note that you have corrected Item No. A, and
4
therefore you need not address yourself to this matter in your response.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosures
[
will be placed in the NRC's Public Document Room.
If this report contains any
1
information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
j
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
c
8005270 M
N
_
_. _
.
Duquesne, Light Company
2
MAR.1.0 1980
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will
be considered by the Commission as listed in subparagraph (b) (4) of Section
2.790. The infonnation sought to be withheld shall be incorporated as far
as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified period, the report will be placed
in the Public Document Room.
Additionally, and in accordance with Section 2.790(d) of the NRC's " Rules
of Practice," Part 2, Title 10, Code of Federal Regulations, documentation
of findings of your control and accounting procedures for safeguarding
special nuclear materials and your facility security procedures are exempt
-
from disclosure; therefore, the pertinent section of the inspection report
will not be placed in the Public Document Room and will receive limited
distribution.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely.
-
e
'
E"d n . Brunner, Chief
Reactor Operations and Nuclear
S6pport Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement
Inspection Report No. 50-344/79-27
cc w/encls:
F. Bissert, Technical Assistant Nuclear (Without Pages 24 & 25 of Report)*
R. Washabaugh, QA Manager (Without Pages 24 & 25 of Report)*
J. Werling, Station Superintendent (Without Pages 24 & 25 of Report)*
'
G. Moore, General Superintendent, Power Stations Department (Without Pages
24 & 25 of Report)*
J. J. Carey, Director of Nuclear Operations (Without Pages 24 & 25 of
Report)*
R. Martin, Nuclear-Engineer (Without Pages 24 & 25 of Report)*
J. Sieber, Superintendent of Licensing ~ and Compliance, BVPS (Without Pages
24 & 25 of Report)*
- Contains 2.790 Information