O AT.'ACIIMENT 2 PRCPOSED TECIINICAL SPECIFICATION CIIANGE NO. 3 NORTl! ANNA POWER STATION UNIT NO. 2 8006220634
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REOUIREMENTS 3/4.0 APPLICA8ILITY LIMITING CONDITION FOR OPERATION 3.0.1 Limiting Conditions for Operation and ACTION requirements shall be applicable during'the OPERATIONAL MODES or other conditions specified for each specification.
3.0.2 Adherence to the requirements of the Limiting Condition for Operation and/or associated ACTION within the specified time interval shall constitute compliance with the specification.
In the event the Limiting Condition for Operation is restored prior to expiration of the specified time interval, completion of the ACTION statement is not required.
3.0.3 In the event a Limiting Condition for Operation and/or associated ACTION requirements cannot be satisfied because of circumstances in excess of those addressed in the specification, the unit shall be placed in at least HOT STAND 8Y within i hour, in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless corrective measures are completed that permit operation under the permissible ACTION statements for the specified time interval as measured from initial discovery or until the reactor is placed in a MODE in which the affected specification is not applicable.
Exceptions to these requirements shall be stated in the individual specifications.
3.0.4 Entry into an OPERATIONAL MODE or other specified applicability condition shall not be made unless the conditions of the Limiting Condition for Operation are met without reliance on provisions contained in the ACTION statements unless otherwise excepted. This provision shall not prevent passage through OPERATIONAL MODE 3 as required to comply with ACTION statements.
ADD 3.0.5 (Attached)
SURVEILLANCE REOUIREMENTS 4.0.1 Surveillance Requirements shall be applicable during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Raquirement.
4.0.2 Each Surveillance Requirement shall be performed within the specified time interval with:
a.
A maximum allowable extension not to exceed 25% of the surveillance interval, and NORTH ANNA - UNIT 2 3/4 0-1 l
u h
3.0.5 When a system, subsystem, train, component or device is determined to be inoperable soley because its emergency power source is inoperable, or solely because its nonnal power source is inoperable, it may be considered OPERABLE for the purpose of satisfying the requirements of its applicable Limiting Condition for Operation, provided:
(1) its corresponding normal or emergency power source is OPERABLE; and (2) all of its redundant system (s), subsystem (s), train (s), component (s) and device (s) are OPERABLE: or likewise satisfy the require-ments of this specification. Unless both conditions (1) and (2) are satisfied, the unit shall be placed in at least H0T STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. This specification is not applicable in MODES 5 or 6.
APPLICABILITY BASES Exceptions to this provision have been provided for a limited number of specifications when startup with inoperable equipment would not affect plant safety. These exceptions are stated in the ACTION statements of the appropriate specifications.
ADD 3.0.5 (Attached) 4.0.1 This specification provides that surveillance activities necessary to insure the Limiting Conditions for Operation are met and will be performed during the OPERATIONAL MODES or other conditions for which the Limiting Conditions for Operation are applicable.
Provisions for additional surveillance activities to be performed without regard to the applicable OPERATIONAL MODES or other conditions are provided in the individual Surveillance Requirements.
Surveillance Requirements for Special Test Exceptions need only be performed when the Special Test Exception is being utilized as an exception to the individual Specification.
4.0.2 The provisions of this specification provide allowable tolerances for performing surveillance activities beyond those specified in the nominal surveillance interval.
These tolerances are necessary to provide operational flexibility because of scheduling and performance considerations.
The phrase "at least " associated with a surveillance frequency does not negate this allowable tolerance value and permits the performance of more frequent surveillance activities.
The tolerance values, taken either individually or consecutively over 3 test intervals, are sufficiently restrictive to ensure that the reliability a,sociated with the surveillance activity is not significantly degraded beyond that obtained from the nominal specified interval.
4.0.3 The provisions of this specification set forth the criteria for determination of compliance with the OPERABILITY requirements of the Limiting Conditions for Operation.
Under this criteria, equipment, systems or components are assumed to be OPERABLE if the associated surveillance activities have been satisfactorily performed within the specified time interval.
Nothing in this provision is to be construed as defining equipment, systems or components OPERABLE, when such items are found or known to be inoperable although still meeting the Surveillance Requirements.
4.0.4 This specification ensures that the surveillance activities associated with a Limiting Condition for Operation have been performed within the specified time interval prior to entry into an OPERATIONAL MODE or other applicable condition.
The intent of this provision is to ensure that surveillance activities have been satisfactorily demonstrated on a current basis as required to meet '
the OPERABILITY requirements of the Limiting Condition for Operation.
l NORTH ANNA - UNIT 2 S 3/4 0-2 I
s
3.0.5 This specification delineates what additional con-ditions must be satisfied to permit operation to continue, consistent with the ACTION statements for power sources, when a normal or emergency power source is not OPERABLE.
It specifically prohibits operation when one division is in-operable because its normal or emergency power source is inoperable and a system, subsystem, train, component or device in another division is inoperable for another reason.
The provisions of this specification permit the ACTION state-ments associated with individual systems, subsystems, trains, components, or devices to be consistent with the ACTION statements of the associated electrical power source.
It allows operation to be governed by the time limits of the ACTION statement associated with the Limiting Condition for Operation for the normal or emergency power source, not the individual ACTION statements for each system, subsystem, train, component or device that is determined to be inoperable solely because of the inoperability of its normal or emergency power source.
For example, Specification 3.8.1.1 requires in part that two emergency diesel generators be OPERABLE. The ACTION statement provides for a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out-of-service time when one emergency diesel generator is not OPERABLE.
If the definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystems, trains, components and devices supplied by the inoperable emergency power source would also be inoperable. This would dictate invoking the applicable ACTION statements.for each of the applicable ~ Limiting Conditions for Operation. However, the provisions of Specification 3.0.5 permit the time limits for continued operation to.be ' consistent with the ACTION statement for the inoperable emergency diesel generator instead, provided the other specified conditions are satisfied.
In this case, this would mean that the corresponding normal power source must be OPERABLE, and all redundant systems, subsystems, trains, components, and devices must be OPERABLE, or otherwise satisfy Specification 3.0.5 (i.e., be capable of performing their design function and have at least one normal or one emergency power source OPERABLE).
If they are not satis-fied, shutdown is required in accordance with this specification.
As a further example, Specification 3.8.1.1 requires in part that two physically independent circuits between the offsite trans-mission network and the onsite Class IE distribution system be OPERABLE. The ACTION statement provides a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> out-of-service time when both required offsite circuits are not OPERABLE.
If the definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystems, trains, components and devices supplied by the inoperable nonnal power sources, both of the offsite circuits, would also be inoperable. This would dictate invoking the applicable ACTION statements for each of the applicable LCOs. However, the provisions of Specification 3.0.5 permit the time limits for continued operation to be con-sistent with the ACTION statement for the inoperable normal
---.___-____---m t
. power sources instead, provided the other specified conditions are satisfied. In this case, this would mean that'for one division the emergency power source must be OPERABLE (as must be the components supplied by the emergency power source) and all redundaat systems, subsystems, trains, components and devices in the other division must be OPERABLE, or likewise satisfy Specification 3.0.5 (i.e., be capable of perfonning their design functions and have an emergency power source OPERABLE).
In other words, both emergency power sources must be OPERABLE and all redundant systems, subsystems, trains, components and devices in both divisions must also be OPERABLE.
If these conditions are not satisfied, shutdown is required in accordance with this specification.