Text
__ _
__
O
p. %'e
7/c
-
,
UNITED STATES
/
84*-
'I-
NUCLEAR REGULATORY COMMISSION
/
se
< ,a
REGION V
8005150
o,
g
1990 N. CnLIFORNIA BOULEVARD
g
e
SUITE 202, WALNUT CREEK PLAZA
e,,,o
WALNUT CREEK, CALIFORNIA 94596
MR 7 1980
Docket N]. 50-361
Southern California Edison Company
P. O. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention:
Dr. L. T. Papay, Vice President
Advanced Engineering
Gentlemen:
Subject: NRC Inspection of San Onofre Unit 2
This refers to the inspection conducted by Messrs J. H. Eckhardt and
G. Hernandez of this office on February 12-15, 1980 of activities
authcrized by NRC Construction Permit No. CPPR-97, and to the discussion
of our findings held with Mr. D. E. Nunn and other members of your staff
at the conclusion of the inspection.
Areas examincd during this. inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, in-
terviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance has been categorized into a level as de-
,
scribed in our correspondence to all NRC licensees dated December 31,
l
1974.
This notice is sent to you pursuant to the provisions of Section 2.201,
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office,
within thirty (30) days of your receipt of this notice, a written statemer.t
_ _ _ _ -
_
_ _ _ _ - _ .
-
.
.
,
,
S6uthern California Edison' Company
-2-
MAR 71990
.
or explanation in reply including (1) corrective steps which have been
taken by you and the results achieved; (2) corrective steps which will
be taken to avoid further violations; and (3) the date when full compliance
will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
. Part 2, Title .10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report'will be placed in the NRC's Public
Document Room.
If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
to this office..within (30) days of the date of this letter, requesting
that such information be withheld from public disclosure. The application
must include a full statement of the reasons why it is claimed that the
.
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
e'
'G. S. Spencer, Chief
..
Reactor Construction and
Engineering Support Branch
Enclosures:
A.
Appendix A - Notice of Violation
B.
Inspection Report
No.- 50-361/80-01
cc w/o enclosure:
R..Dietch, Vice President
Nuclear Engineering & Operations SCE