Text

'

A!Ai.

y O

V 8005150 APPENDIX A Southern California Edison Company P. O. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 Docket Number 50-361 Construction Permit Number CPPR-97 NOTICE OF VIOLATION Based on the results of the NRC inspection conducted on February 12-15, 1980, it appears that one of your activities was not conducted in full compliance with the conditions of your NRC Construction Permit Number CPPR-97 as indicated below:

10 CFR 50, Appendix B, Criterion X requires that "A program for inspection of activities affecting quality be established and executed.... to verify conformance with documented instructions, procedures and drawings....".

Bechtel WPP/QCI-414, Revision 5, requires that the construction field engineer and quality control engineer verify that hot and cold indicators are as specified, lock nuts are installed and locked, and installation welds are in compliance with pipe support drawings.

Contrary to the above 6n February 14, 1980 the NRC Inspector identified two pipe supports (S2-FW-223-H-016 and S2-GR-064-H-007) with hot and cold indicators not set in accordance with the drawings, tour supports (S2-CC-078-009, S2-CC-080-H-009, S2-FS-025-H-006 and S2-GR-064-H-007) which did not have lock nuts tightened, and one support (S2-FS-010-H-005) with field welds not as specified on the drawings. All of these supports had received QC final inspection prior to February 14, 1980.