ML19323C182

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 800219-29
ML19323C182
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/27/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19323C170 List:
References
50-413-80-04, 50-413-80-4, 50-414-80-04, 50-414-80-4, NUDOCS 8005150109
Download: ML19323C182 (1)


Text

- - - - - - - - - - - - - - - - - - -

8005250 gC O

APPENDIX A NOTICE OF VIOLATI N Duke Power Company License No. CPPR-117 Catawba Nuclear Station, Unit 2 Based on the NRC inspection February 19-29, 1980, certain of your activities were apparen*.ly not conducted in full compliance with NRC requirements as indi-cated below. These items have been categorized as described in correspondence to you dated December 31, 1974.

As required by Criterion XV of Appendix B to 10 CFR 50, and implemented by Duke Power Company Topical Report, paragraph 17.1.15, " Measures shall be established to control material...in accordance with documented procedures.

Catawaba procedure Q-1, revision 12 requires that any person discovering a nonconforming item shall initiate a nonconformance report.

Contrary to the above, a nonconformance report was not initiated to control a " struck hold down bolt" in the Unit 2 steam generator.

This is a deficiency, not requiring a written response.

n.

.P T y er-

~

.