Forwards IE Insp Repts 50-413/80-04 & 50-414/80-04 on 800219-29 & Notice of Violation
ML19323C175
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/03/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19323C170 List:
References
NUDOCS 8005150102
Download: ML19323C175 (2)


See also: IR 05000413/1980004

Text

__ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _

ft%q'o

UNITED STATES

r

  1. '

g

NUCLEAR RE'IULATORY COMMISSION

r

REllONil

B005.150l4A

k

101 MAR lETTA ST., N.W., SUITE 3100

O

ATLANTA, GEORGIA 30303

)

o

g.....o

N

3 56

V

In Reply Refer To-

RII: GEM

50-413/80-04

50-414/80-04

Duke Power Company

AITN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by G. F. Maxwell of this office on

February 19-29, 1980 of activities authorized by NRC Construction Permit Nos.

CPPR-116 and CPPR-117 for the Catawba facility, and to the discussion of our

'

findings held with D. G. Beam at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

One new unresolved item resulted frcm this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

Durir

. inspection it was found that certain activities under your license

appear to be in noncompliance with bRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

Corrective actions to prevent recurrence were completed prior to

the conclusion of this inspection; therefera, a reply is not requested.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your cortractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

,

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

___

. . ~ _._.

_

..

.

. _ _ _ _ _

-

_ _ _ - _ _

cf

-

Duke Power Company

-2-

M

31980

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C. E. !IL.r y, Chici

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-413/80-04

and 50-414/80-04

cc w/ encl:

J. W. Hampton, Station Manager

P. O. Box 392

Clever, SC 29710

D. G. Beam, Project Manager

P. O. Box 223

Clover, SC 27910