ML19323A883

From kanterella
Jump to navigation Jump to search
Emergency Procedure 2-AP-22.5, Placing 2-FW-P-2 in Svc to Feed Steam Generators 2-RC-E-1B & 2-RC-E-1C.
ML19323A883
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/29/1979
From: Harvey S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19323A861 List:
References
2-AP-22.5, NUDOCS 8005060166
Download: ML19323A883 (5)


Text

r- - _. - -. . - . .

.- . - - - - ._ -a NOT A C'.' '.;LLED O ,

2-AP-22.5 Page 1 of 5 5

11-29-79

. . . 7N VIRGINIA ELECTRIC AND P0 tier C0}!PA'.T NORTH ANNA P0k7.?, STATION UNIT NO. 2 PLACING 2-Fk'-P-2 IN SERVICE TO FEED STEA.'i GENERATORS 2-RC-E-1B AND 2-RC-E-1C FIFERENCES:

1. T.S. 3.7.1.2, 3.7.1.3
2. 12050-FM-74A
3. 12050-LSK-5-13A, B and C
4. 12050-ESK-5AA, 5AB, 6PR, and 6CL
5. Final Safety Analysis Report h

REV. PAGE DATE APPROVAL

_ . ____.1

. . .- , , . -:y*

~ ] ,

. j

..\

g. i s

REC 0!DfEND APPROVAL: /w //, . j n :V il APPROVED BY: \9:

CHAIR'M _jTATION NCCLEAR SAFETY Cw,G AND OPI?.ATING CC?ctITTEE l t

DATE: I1-09 '

SAFETY RELATED

r

. _ _ . . , ..__._-.1 2- AP-22.5 Page 2 of 5 11-29-79 1.0 Purnose 1.1 This procedure provides i=cediace and lodg ter:n operator actions to be taken in 2-W-P-2 in service to as a steam generators feed source to 2-RC-E-1B via the MOV header and to 2-RC-E-IC via the HCV Header. .

2.0 Indications 2.1 Abnormal steam generatc,: levels.

2.2 Abnormal auxiliary feedwater flows.

3.0 Probcble Cause 3.1 Loss of one or more auxiliary feedwater pumps.

3.2 Secondary coolant breaks on the secondary side of a steam h

generator.

.~

.. g.

r

  • 2-AP-22.5 Page 3 of 5 11-29-79 4.0 Icunediate Operator Actions 4.1 None m

9

& 2-AP-22.5 Page 4 of 5 11-29-79 Initials 5.0 long Term Operator Action NOTE: If a stean generator is dry, depressurize the primary systems to less than 16005 across the tube sheet and then cooldown and depressurize the primary aysten using the other operable steam generators.

If all three steam generators loosing level together, feed and bleed all three steam generators and increase levels very slowly. Reduce primary heat sources to a minimum by securing 2 reactor coolant pumps.

NOTE: When level in emergency condensate storage tank reaches 9 feet (37.3% as read on LI-CN-200 in control room) or when suction pressure to aux feed water pumps reaches 4 psig, commence filling the emergency condensate storage tank.

5.1 Verify valve checkoff sheet 2-OP-31.2A is completed.

5.2 Verify steam generator level indication is available.

5.3 Verify electrical power is available for MOV and/or HCV opera-tion. (Valves will have to be operated manually if power is h not available).

5.4 Unlock and open 2-FW-317 if it is desired to feed 2-RC-E-1B via MOV FW200B.

5.5 Unlock and open 2-FW-157 if it is desired to feed 2-RC-E-IC via HCV FW200C.

5.6 Isolate tne steam supply from affected steam generators to 2-FW-P-2 by closing 2-MS-13 from 2-RC-E-IA 1-MS-57 from 2-RC-E-1B, or 2-MS-95 from 1-RC-E-IC. .-

=v NOTE: Steam pressure will be higher in steam generators with lower levels. If Safety Injection has not occurred limit steam line differential pressure to less than 100# AP or safety injection will occur.

5.7 Open TV MS 211A or B to start 2-FW-P-2.

5.8 Regulate MOV FW 200D to control level in 2-RC-E-1A, MOV FW 2003

]

to control level in 2-RC-E-1B and HCV FW 200C to control level in 2-RC-E-1C. l 1

l 1

1 2-AP-22.5 Page 5 of 5 11-29-79 Initials 5.0 Lone Term Ooerator Action (cont.)

5.9 Make-up to 2-CK-TK-1 as required.

NOTE: Return auxiliary feedwater system to normal from this lineup by 2-AP-22.6.

Completed By:

Date:

3 - :

s

% s

.r--em~, r-- ..m -- ,.cm.. , - -,, . ..,-- , - < -