-_
= _,..
80 05060 l lob u
NOT A CC.TCLLED 0
2-AP-22.4 e=S 1 et '
11-29-79
- 5 s
L.
- _, a VIRGINIA ELECTRIC AND P0t.ER COMPANY NORTH ANNA POL'ER STATIO?!
UNIT NO. 2-REMOVING 2-Fil-P-3A and/or 3B FROM SERVICE AS A STEAM GENERATOR FEED SOURCE VIA THE MOV HEADER
REFERENCES:
1.
T.S. 3.7.1.2, 3.7.1.3 2.
12050-FM-74A 3.
12050-LSK-5-13A, B and C 4.
12050-ESK-5AA, 5AB, 6PR, and 6CL 5.
Final Safety Analysis Report.
REV.
PAGE _
DATE APPROVAL
_#e t
c
~~~~ p ' po y 0,g D L'.'i' Y ',1,
--, 7-
\\ <v: ~=~ :,: ',,,,, p*
= '.., ai t <
~~
w p
- ::D-1
- .,. e.-a t
},,......y :.t,:_.....
.... - rc7..,., g.. }
\\
\\., 4
-- _.s i -,:..
...,1 sb.. I g
, ?.. '. ', -
.7-'
.....,ca TO I
-s 6 -
- 10.01 h;
\\ g - b....=:
~,,
2
\\
, 13 :'; --
f
\\.
- ~~" p s
- 1 e
RECOMMEND APPROVAL:
- V,
)i/fl s
APPROVED BY:
\\
x<
CHAIRMAN _ STATION NUCLEAR SAFETY AND OPERATING CO.TfITTEE DATE:
11-29-79 SAFETY RELATED i
c t
2-AP-22.4 Page 2 of 4 11-29-79 1.0 Purpose 1.1 This procedure provides irmnediate and long term operator actions-to be taken in removing 2-FW-P-3A and/or 3B from service as a Steam Generators Feed Source via the MOV Header.
2.0 Indications 2.1 None 3.0 Probable Cause 3.1 Auxiliary feedwater system is in an improper lineup.
f' b@'.
e i
l J
i 2-AP-22.4 Page 3 of 4 11-29-79 4.0 Irenediate Operator Actions 4.1 None
\\
1 N
l
6 2-AP-22.4 Page 4 of 4 11-29-79 Initials 5.0 Long Term Operator Action NOTE:
b' hen lesel in emergency condensate storage tank reaches 9 feet (37.3" as read on LI-CN-200 in control room) or when suction pressure to aux feed water pumps reaches 4 psig, cor.mence filling the emergency condensate storage tank.
NOTE:
Required lineup in modes 1, 2, 3, and 4 is 2-W-P-3A is lined up to "C" steam generator, 2-W-P-3B is lined up to "B" steam generator.
5.1 Place the Pump Control Mode Selector switch (es) for the Aux-iliary Steam Generator Feedwater Puzp(s), 2-FW-P-3A and/or 3B to the " Pull-to-Lock" position.
5.2 Close and lock 2-W-64 and 128 (MOV Ndr. to "A" and "C" Stm.
Gen.).
5.3 If required, close 2-W-173 (2-W-P-3A Disch. to MOV Edr.).
5.4 If required, open 2-W-174 (2-W-P-3A Disch. to KCV Hdr.).
5.5 Verify open MOV-W-200B, 200D and NCV-EV-200C (Normal Auxiliary Feedwater Pucp Lineup).
5.6 Make-up to 2-CN-TK-1 as required.
Completed By:
Date:
NOTE:
Independent verification is required when returning the system to normal.
Valve Positions Independently Verified By:
Date:
.