Emergency Procedure 2-AP-22.4, Removing 2-FW-P-3A &/Or 3B from Svc as Steam Generator Feed Source Via MOV Header.
ML19323A878
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/29/1979
From: Harvey S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19323A861 List:
References
2-AP-22.4, NUDOCS 8005060162
Download: ML19323A878 (4)


Text

_ .. . - , _ - - . _ . - -. - -_

-. = _ , . .

u  % 80 05060 l lob NOT A CC.TCLLED 2-AP-22.4 0 -

e=S 11-29-79 1 et '

s

5 L. ..

- _, a '

VIRGINIA ELECTRIC AND P0t.ER COMPANY NORTH ANNA POL'ER STATIO?!

UNIT NO. 2-REMOVING 2-Fil-P-3A and/or 3B FROM SERVICE AS A STEAM GENERATOR FEED SOURCE VIA THE MOV HEADER --

REFERENCES:

1. T.S. 3.7.1.2, 3.7.1.3
2. 12050-FM-74A
3. 12050-LSK-5-13A, B and C
4. 12050-ESK-5AA, 5AB, 6PR, and 6CL
5. Final Safety Analysis Report.

REV. PAGE _ DATE APPROVAL

_#e t

--, 7-c ~~~~ p ' po y 0,g D L'.'i' Y ',1, ~~

l

\ <v: ~=~ :,: ',,,,, p* w

= ' . ., ai t < p

.,. e.-a t

} ,,. . . . . .y :.t ,:_. .. . .

.  : ::D-1

.... - rc7..,. , g. . }

\

\ ., 4 , -- _.s i - ,: .. ... ..,1

- sb .. I g ,

, ? .. '

.7-' .... .,ca TO I

-s 6 - - , - 10.01 h;

~ ,,

\ g - b.. ..=: .

2

\ '

, 13 :'; --

f ,

e

\.

- ~~" p s . :1 RECOMMEND APPROVAL: s ;V, . )i/fl APPROVED BY: \ x<

CHAIRMAN _ STATION NUCLEAR SAFETY AND OPERATING CO.TfITTEE DATE: 11-29-79 SAFETY RELATED 1

i l

c

'.-- t 2-AP-22.4 Page 2 of 4 11-29-79 1.0 Purpose 1.1 This procedure provides irmnediate and long term operator actions-to be taken in removing 2-FW-P-3A and/or 3B from service as a Steam Generators Feed Source via the MOV Header.

2.0 Indications 2.1 None 3.0 Probable Cause 3.1 Auxiliary feedwater system is in an improper lineup.

f' b@'.

e i

l l

J

. i 2-AP-22.4 Page 3 of 4 11-29-79 4.0 Irenediate Operator Actions 4.1 None

\

1 N

l l

1 l

l l

% 6 2-AP-22.4 Page 4 of 4 11-29-79 Initials 5.0 Long Term Operator Action NOTE: b' hen lesel in emergency condensate storage tank reaches 9 feet (37.3" as read on LI-CN-200 in control room) or when suction pressure to aux feed water pumps reaches 4 psig, cor.mence filling the emergency condensate storage tank.

NOTE: Required lineup in modes 1, 2, 3, and 4 is 2-W-P-3A is lined up to "C" steam generator, 2-W-P-3B is lined up to "B" steam generator.

5.1 Place the Pump Control Mode Selector switch (es) for the Aux-iliary Steam Generator Feedwater Puzp(s), 2-FW-P-3A and/or 3B to the " Pull-to-Lock" position.

5.2 Close and lock 2-W-64 and 128 (MOV Ndr. to "A" and "C" Stm.

Gen.).

5.3 If required, close 2-W-173 (2-W-P-3A Disch. to MOV Edr.) .

5.4 If required, open 2-W-174 (2-W-P-3A Disch. to KCV Hdr.).

5.5 Verify open MOV-W-200B, 200D and NCV-EV-200C (Normal Auxiliary Feedwater Pucp Lineup).

5.6 Make-up to 2-CN-TK-1 as required.

Completed By:

Date:

NOTE: Independent verification is required when returning the '

system to normal.

Valve Positions Independently Verified By:

Date: