Forwards IE Insp Rept 50-302/80-07 on 800128-0201 & Notice of Violation
ML19322E984
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/15/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19322E982 List:
References
NUDOCS 8004040447
Download: ML19322E984 (2)


See also: IR 05000302/1980007

Text

'

1

s

l

q#

jo

UNITED STATES

g

V!

NUCLEAR REGULATORY COMMISSION

g

,

g

.t

REGION il

o,

'f

101 MARIETTA ST., N.W.. SUITE 3100

b

o

ATLANTA. GEORGIA 303o3

FEB 151980

_

In Reply Refer To:

RII:BRM

50-302/80-07

Florida Power Corporation

ATTN:

J. A. Hancock, Director

Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

,

This refers to the inspection conducted by B. Messitt of this office on January 28

to February 1, 1980 of activities authorized by NRC License No. DPR-72 for the

Crystal River facility, and to the discussion of our findings held with D. C.

Poole at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

t

Regulations.

Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

'

including:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

8004040 i

.

._.

_

_

. _ .

_ _ _ _ _ _ _ _ _ _ _

_

' :

i

FEB 151980

Florida Power Corporation

-2-

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

,

'

Sincerely,

O m '-

v

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

.

Inspection Report No. 50-302/80-07