Forwards IE Insp Rept 50-334/79-29 on 791212-14 & Notice of Violation
ML19322E505
Person / Time
Site: Beaver Valley
Issue date: 01/31/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Dunn C
DUQUESNE LIGHT CO.
Shared Package
ML19322E499 List:
References
NUDOCS 8003280269
Download: ML19322E505 (2)


See also: IR 05000334/1979029

Text

e

.

g

UNITED STATES

},

o

NUCLEAR REGULATORY CoMMISslON

!}),(

g

REGION I

$

'M

.. C

631 PARK AVENUE

  • '-

f

KING OF PRUS$1 A. PENNSYLVANIA 19404

k+.

/

....

gN 31 1980

Docket No. 50-334

Duquesne Light Company

ATTN: Mr. C. N. Dunn

Vice President

Operations Division

435 Sixth Avenue

Pittsburgh, Pennsylvania 15219

Gentlemen:

Subject:

Inspection Report No. 50-334/79-29

This refers to the inspection conducted by Mr. W. A. Rekito of this office on

December 12-14, 1979 at Beaver Valley Power Station, Unit 1

Shippingport,

Pennsylvania of activities authorized by NRC License No. DPR-66 and to the

discussions of our findings held by Mr. W. A. Rekito with Mr. J. Werling of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels as described in our correspondence to you

dated December 31,1974.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Section 2.201 requires you to submit to this office,

within twenty (20) days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken by

you and the results achieved; (2) corrective steps which will be taken to avoid

further items of noncompliance; and (3) the date when full compliance will be

achieved.

8003280 '2.M

-

.

,

pg 31 1980

Duquesne Light Company

2

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any information

that you (or your contractor) believe to be proprietary, it is necessary that

you make a written application within 20 days to this office to withhold such

information from public disclosure. Any such application must be accompanied by

an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

Commission as listed in subparagraph (b) (4) of Section 2.790. The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

f.C. MCJL. h

k

Eldon J. Bruhne., Ach t

r, Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

<

Report Number 50-334/79-29

cc w/encls:

,

F. Bissert, Technical Assistant Nuclear

i

R. Washabaugh, QA Manager

'

J. Werling, Station Superintendent

G. Moore, General Superintendent, Power Stations Department

J. J. Carey, Nuclear Technical Assistant

R. Martin, Nuclear Engineer

9