ML19322E230
| ML19322E230 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 03/14/1980 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Jones OMAHA PUBLIC POWER DISTRICT |
| References | |
| NUDOCS 8003260328 | |
| Download: ML19322E230 (1) | |
Text
CENI N pth'S bcc t 90R B0
. s = t o,,,
UNITED STATES kpgg
/
ascles tv NUCLEAR REGULATORY COMMISSION Jg i
i an ava.N pu:A :mvs. sci 7s =
MSIC j
y uuNor:.. Ts:< As --ss :
March 14, 1980 States
~-
Docket No.
50-285 Omaha Public Power District ATTN:
W. C. Jones, Division Manager -
Production Operations 1623 Harney Street Omaha, Nebraska 68102 Gentlemen:
The enclosed IE Circular No. 80-04 is forwarded to you for information.
No written response is required.
Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.
Sincerely, t,$
Karl V. Seyfrit g Director
Enclosures:
1.
IE Circular No. 80-04 2.
List of Recently Issued IE Circulars ec:
S. C. Stevens, Manager Fort Calhoun Station Post Office Box 98 Fort Calhoun, Nebraska 68102 8 003260]Qg
l SSINS NO. 6830 Accession No.:
UNITED STATES 7912190662 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
'N WASHINGTON, D.C.
20555 D
'#Dh"'
av ev 22 eU n IE Circular No. 80-04 Date: March 14, 1980 Page 1 of 3 SECURING OF THREADED LOCKING DEVICES ON SAFETY-RELATED EQU'IPMENT Description of Circumstances:
In recent months, several licensee event reports have been submitted that Oddress the inoperability of safety-related equipment caused by loosened bureaded locking devices.
Some of the events are listed below:
I.
MAIN STEAM CHECK VALVE HEX NUT LOCKING DEVICES, TURKEY POINT NO. 3 REPORTABLE OCCURRENCE 250-79-31 (Oct. 22, 1979)
During a planned outage of Turkey Point Unit No. 3 on October 7, 1979, a two-inch internal diameter hex nut was discovered in the internals of a steam supply valve for a moisture separator-reheater.
Investigation revealed that the nut was missing from the disc stud of the 3A main steam check valve. The disc and disc stud were in the proper position and the valve was fully operable. The 3B and 3C main steam check valves were inspected and the disc stud, nut and locking washer were in place although some (1 stress was noted on the 3C locking washer in that the tack welds on the locking pin had separated.
The licensee installed an improved locking device on the disc stud on each of the three main steam check valves. The locking device consists of a tab washer that is prevented from rotating by a pin and by fingers that extended on either side of the valve arm; the tabs are bent up against two faces of the hex nut.
The main steam isolation valves (MSIV) have the same type of hex nut locking device. The valves are Schutte and Koerting SK Type 828.
II.
SLIPPAGE AND MISALIGNMENT ~
LLVE LINKAGES, DAVIS-BESSE LICENSEE EVENT REPORT NOS.78-101 (Nov. 1, _>78),78-126 (Jan. 26, 1979),79-068 (July 19, 1979), and 79-098 (Oct. 30, 1979)
These reports involve the inoperability of two service water system valves and one component cooling water system valve.
The valves were declared inoperable because the nut on the actuator linkage was either missing or had loosened to the point where there was slippage and misalignment of the valve linkage. Trese valves were provided by Hammel-Dahl. The supplier has provided the licensee with an addendum to the instruction manual that defines the tocque requirements for the cap screw that is used to retaiu the actuator link arm to the valve disc arm.
IE Circular No. 80-04 Date: March 14, 1980 Page 2 of 3 III. ECCS SUBSYSTEM INOPERABLE - NO. 12 SAFETY INJECTION PUMP IMPELLER LOCKNUTS LOOSE, SALEM NO. 1, LICENSEE EVENT REPORT NO. 79-68 (Dec. 20, 1979).
4 The AC supply breaker tripped when No. 12 Safety Injection (SI) Pump was started, to fill the accumulators on October 18, 1979. When the rotor could not be turned by hand, the upper casing was removed for an inspec-tion of the pump internals.
The radial and thrust locknuts were found loosened to the extent that they could be removed by hand. The impeller spacer sleeves were worn and the impeller shaft was slightly bent. The pump was reworked, tested and returned to service on November 2, 1979.
The lockauts on the three other Unit I and Unit 2 Safety Injection (SI)
Pumps were inspected and two pump impeller locknuts were found loose, and one pump impeller locknut was found secured with setscrews that had been installed by mistake at the manufacturing facility and the impeller was sent back to the manufacturer for rework.
The locknuts on all of the SI pumps were secured using Locktite compound per Public Service Engineering Department recommendation and the pump manufacturer's concurrence. The pumps are horizontal, centrifugal, ten stage units manufactured by Pacific Pumps, Inc.
IV. TARGET ROCK MOTOR OPERATED GLOBE VALVES - BUSHING NOT STAKED, ANO NO. 2 LICENSEE EVENT REPORT 79-93 (Feb. 14, 1980)
While investigating the failure of a High Pressure Safety Injection (HPSI) header shut-off valve at Arkansas Nuclear One, Unit 2, (ANO-?.) the threaded bushing was found loose.
The bushing was not staked or other-wise secured to prevent movement.
This bushing is part of the mechanism which converts the valve stem rotation to linear travel of the disk.
The full open limit switch is gear driven by the valve operator and movement of the bushing can alter the relationship between stem rotation and linear travel such that valve travel in the open direction may be terminated prematurely by the limit switch. The HPSI header shut-off valves at ANO-2 are Target Rock, 2-inch, 1500#, ANSI Motor Operated Globe Valves. Arkansas Power & Light found that a similar problem exists with the Low Pressure Safety Injection (LPSI) head.er shut-off valves which are Target Rock, 6-inch, 1500#, ANSI Motor Operated Globe Valves. Target Rock has provided Arkansas Power & Light Company with a procedure for staking the bushing nuts.
V.
OTHER EVENTS Loose locking devices were also identified in one of the IE Bulletins and two of the IE Circulars issued in 1979:
IE Circular 79-04 Loose Locking Nut on Limitorque Valve Operators, IE Circular 79-19 Loose Locking Devices on Ingersoll-Rand Pumps, IE Bulletin 79-15 Deep Draft Pumps.
L
IE Circular No. 80-04 Date: March 14, 1980 Page 3 of 3 Recommended Action for Licensee Consideration:
It is recommended that licensees of operating power reactors and holders of construction permits review the specific items presented in the " Description of Circumstances" for applicability at their facilities and review their installation and maintenance procedures to determine whether securing of locking devices has been addressed in these procedures.
It is further recommended that installation and maintenance procedures for all safety-related ccmponents be reviewed to be sure the securing of locking devices is adequately covered.
No written response to this Circular is required.
If you require additional information regarding these matters, contact the Director of the appropriate NRC Regional Office.
i l
IE Circular No. 80-04 March 14, 1980 RECENTLY ISSUED IE CIRCULARS Circular Subject Date Issued To No.
Issued 79-22 Stroke Times for Power 11/16/79 All Power Reactor Oper-Operated Relief Valves ating Facilities and all Utilities having a Construction Permit (CP) 79-23 Motor Starters and 11/26/79 All Power Reactor Oper-Contactors Failed to ating Facilities and Holders Operate of Reactor Construction Permits (cps) 79-24 Proper Installation and 11/26/79 All Holders of a Calibration of Core Spray Power Reactor Operating Pipe Break Detection License (OL) or Equipment on BWRs.
Construction Permits (cps) 79-25 Shock Arrestor Strut 12/20/79 All licensees and Assembly Interference holders of power reactor construction Permit (CP) 80-01 Service Advice for GE 1/17/80 All licensees of nuclear Induction Dise Relays power reactor operating facilities and holders of nuclear power reactor Construction Permits (cps) 80-02 Nuclear Power Plant Staff 2/1/80 All holders of Reactor Work Hours Operating Licenses (OLs),
including research and test reactors, and Construction Permits (cps) 80-03 Protection from Toxic Gas 3/6/80 All holders of a power Hazards reactor Operating License (OL)
Enclosure i
a r
-