ML19322A902

From kanterella
Jump to navigation Jump to search
Discusses Insp Rept 50-269/73-07 on 730620-21.Major Areas Inspected:Procedures,Records & Personnel Interviews
ML19322A902
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 09/24/1973
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19322A903 List:
References
NUDOCS 7911270658
Download: ML19322A902 (3)


See also: IR 05000269/1973007

Text

_

___

_

. _ _ .

'

9

c. ,

P

.,

[ "g\\

UNITED STATES

,

j

,

ATOMIC ENERGY COMMISSION

'

e(

DIRECTORATE OF REGULATCRY CPE2ATICNS

,

J

aso o n - suite eis

,.

230 68E ACHT att sf MEET, NontMwes?

N4 Tg 5O'

,

,

AT L A pef A, GE oRGI A 30303

-

EP 2 41973

In Reply Refer To:

~

RO:II:CEM

50-269/73-7

Duke Power Conpany

l

ATTN:

Mr. A. C. Thies, Senior Vice President

i

Production and Transmission

Power Building

422 South Church Street

Charlotte, North Carolina 28201

Gentlemen:

This refers to the inspection conducted by Messrs. Murphy, Jape and Warnick

of this office on June 20-21, 1973, of activities authorized by AEC Operating

License No. DPR-38 for the Oconee Nuclear Station 1 facility, and to the

discussion of our findings held by Mr. C. E. Murphy with Messrs. Powell and Smith

of your staff at the conclusion of the inspection.

I

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records, and

interviews with personnel.

In accordance with Section 2.790 of the AEC's " Rules of Practic,e," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter anti the

'

enclosed inspection report will be placed in the AEC's Public Document

,

i

Room. If this report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to

'

i

this office requesting that such information be witnheid from public

-

disclosure.

If no proprietary information is identified, a written

statement to that effect should be submitted. If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

in the Public Document Rocm. Your application, or written statement

,

!

!

..

3911270 h

CP

_

_

.-

. - -

--_ _ _ _ __

.

__

_

I

4

1

-

,o

.

.

(

Duke Power Comt'ny

-2 -

- SEP 24 573

should be submitted to us within 20 days. If we are not contacted as

specified, the enclosed report and this letter may then be placed in the

Public Document Room.

.

Should you have any questions concerning this letter, we will be glad

to discuss them nith you.

Very truly yours,

  • N

'

Norman C. Moseley

yptrector

Enclosure:

RO Inspection Report No.

50-269/73-7

.

.

4

.

-

~

,

.

.

l

.

- - .

_ _

__

_

_

_

- _.

_

_ _

,

. _ _ _ . . - - . _

_ _ _

_ __

_

_

. _ _

,

.

..

.

,,

~

(.

.

.

Ltr to Duke Power Company fm N. C. Moseley

4t*

SEP 241973

.

'

'

.

DISTRIBUTION:

cc w/encli

H. D. Thornburg, RO

RO:HQ (4)

Directorate of Licensing (4)

p_

- uR Central Files

m

sd-

  • PDR

,

l

  • NSIC

I

^

  • State

.

.

  • To be dispatched at a later date.

.

I

1

.

%

9

,

-

,

4

o*

\\

l

.

m