Requests Preparation of Notice of Violation Re Insp Rept 50-269/73-07 on 730620-21 Per Encl Draft Ltr
ML19322A923
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 07/31/1973
From: Thornburg H
US ATOMIC ENERGY COMMISSION (AEC)
To: James Keppler
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19322A903 List:
References
NUDOCS 7911270690
Download: ML19322A923 (5)


Text

k pQ

^

^

-\\

N J. G. Kappisr, RO f $L.4I?* f u

FS&EB ACTION CCNTROL FORM A.

Action Code Fn 41 %

Duke Power Co, Oconee 1 Name of Licensee and Facility 50-269 Docket No. or License No.

Notice of Violation Title Date Rec'd 7/31/73 RO:II Origin B.

FS&EB Branch Coordinator:

Bryan Dreher _

Ellis Paulus __ X Completion Requested by C.

Action Requested of:

ADREMP M&PPOB EPB RPB ADC0 oB y

c3 TAB OOE Region 8/8/73 7/31/73 Completion Requested by Date Requested Draf t notice of violation (attached) and RO Insrectin, n anre a

Reference 50-269/73-7 D.

Action Requested Please prepare a notice of violation for the signature of the Director i

based on the attached draf t notice. Copies of the inspection report have been received and your of fice should have a copy through routine distribution.

i I

E.

Date Action Completed Close-out (Date & Method)

If completion date is not consistent with your work schedule, Comments:

pisase let us know.

[tLL5L[4<.y to d Thornburg, Chief Field Support & Enforcement Branch Regulatory Operations cc:

J. G. Davis,.RD N.C.Moseley, RO:II

-i

a-wie _

. m,i J.,.. _.

-?"Y l

-I#

d 1

Duke Power Ccapany Attu: Mr. A. C. Thies Senior Vice President Production and Transmission Power Building 422 South Church Street Charlotte, North Carolina Gentlemen:

~

f I.

This letter refers to the inspection of your activities authorized under AEC Operating License No. DPR-38 conducted by Messrs. Murphy, Warnick and Jape of Region II (Atlanta) Regulatory Operations Office on June 20-21, 1973, at the Oconee Nuclear Station.

Based 'on the results of this inspection, it appears that certain of your activities were not conducted in full conpliance with AEC require-These matters which Messrs. Murphy, Warnick and Jape ~ discussed ments.

with Mr.. Powell and members of his staff at the ebuclusion of the i

i inspection are identified in the enclosed report. They were also discussed in a meeting in your office on July 19, 1973, with you and r

l Messrs. Horn, Parker, Lee and Powell by Messrs. Moseley, Murphy cnd l

Jape of the Region II (Atlanta) office. These violations have bden i

categorized into severity levels as described in corresponsdence to you dated June 5, 1973.

G

...m-e

%4

...,e-

\\

J

---r------

n,

/

/ -

.?

,c As you are aware from the " Criteria for Decernining Enforcement Action,"

which was provided to you by our letter of Nove=ber 1,1972, the enforce-ment actions available to us in the exercise of our regulatory responsibilities include administrative actions in the form of written notices of violations, civil monetary penalties, and orders pertaining to the modification, suspension or revocation of an operating license.

After careful evaluation of the license violations identified in the enclosure, and with consideratio'n given to the relatively short period of time you have possessed an AEC facility operating license, this l

Notice of Violation is sent to you pursuant to the provisions of Section 2.201 of the AEC's " Rules of Practice," Part 2, Title 10, Code of r

o i

Federal Regulatifons.

Section 2.201 requires you.to sdbmit to this office

  • !l I

within 20 days of your receipt of this notice, a written state =ent of explanation in reply including:

(1) corrective steps which have been taken by you, and the results achieved; (2') corrective steps which will be taken to avoid further violations; and (3) the date when full compliance vill be

'1 achieved.

i As discussed during the meeting in your office on July 19, 1973, we believe that collectively the inspection findings are indicative of a u

failure to adequately implement your operational quality assurance program.

l Therefore, in addition to your response.to the specific violations identified I

in the enclosure, please provide us with your comnents regarding those actions taken or planned to improve the effectiveness of your quality assurance program and management control systems. The Co= mission is prepared to i

i take the enforcement action it deems necessary to see that the required l

actions are taken pronptly.

a.v,. - - -

~~

~

I-E

___ _ _ _ _ m_

.. a.a=m-- -

O

~

s m

In accordance with Section 2.790 of the AEC's "Kules of Eractice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report vill be placed in the AEC's Publ.ic Document Room. If this report contains any infor:aation that you believe to ae proprietary, it is necessary miat you subsit a written application to this office requesting that such information be withheld from public disclosure.

If no proprietary infor=ation is identified, a written state =ent to that e ffect should,be submitted.

If an aprlication is

/

- - subnitted, it must fully identify the bases for which infor=ation is claimed to be proprietary. The application should be prepared so that information sought to be withheld is incorporated in a separate paper and referenced in the application since the application will be placed 1

in the Public Docu=ent Room. Your application, or written statement, J

should be sub=itted to us within 20 days.

If we are not contacted as specified, the enclosed report and this letter may then be placed in the Public Docu=ent Room.

Should you have any questions concerning this letter, we would be glad to discuss them with you.

'j Very truly yours, l

~;

Donald F. Knuth, Director

]

Directorate of Regulatory Operations

+.

\\-

e..--

9

,-)

.3-

~

1.

I 1

Enclosure:

Inspection Report No.

)

50-269/73-7 l

i 1

s l

l e

g e

i O

e t

1 I

t

=

a O

4 0

1 "

9 4

t.

[

l 1

a e

w -

w

(

,,