ML19322A702

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-269/72-07,50-270/72-06 & 50-287/72-04 on 720627 & 0718-21.One Item of Noncompliance Noted
ML19322A702
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/01/1972
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19322A703 List:
References
NUDOCS 7911210748
Download: ML19322A702 (1)


See also: IR 05000269/1972007

Text

.

.

'

,[*406'r'O+t

ATOMIC ENERGY COMMISSION

'e

UNITED STATES

<

'

'

REGION 11 - SulT E 818

230 P E AC HT R EE ST RE ET, NORT HWEST

Yg6 geno g; (4048,26 4903

lig gg gn

AT L A NT A GEORGI A 30303

DIRECTORATE OF REGULATORY OPERATIONS

l

l

September 1,1972

[

'

J. B. Henderson, Chief, Reactor Construction Branch

Directorate of Regulatory Operations, Headquarters

DUKE POWER COMPANY (OCONEE 1, 2 AND 3), LICENSE NOS. CPPR-33, 34 AND 35,

DOCKET NOS. 50-269, 270 AND 287

The attached report of a routine announced inspection on June 27, 1972,

and July 18-21, 1972, is forwarded for information. One item of non-

l

compliance with 10 CFR 50, Appendix B, was included in the Region II

!

letter to Duke concerning this inspection.

Duke continues to make satisfactory progress in repairing the damaged

peactor coolant system components. Duke's velding consultant apparently

is being given free rein in correcting deficiencies in Duke's velding and

NDT programs. Work in both these areas is not expected to be completed

,

until approximately November 1972.

l

l

Attached to this memorandum is an Outstanding Ite=s List containing

I

presently identified items which we believe =ust be resolved prior to

core loading of Unit 1.

'

,

l

C. E. Murp y Acting Chief

RO:II:CEM

Reactor Test and Startup Branch

Enclosures:

1.

Outstanding Ite=s List

2.

R0 Rpt. Nos. 50-269/72-7,

50-270/72-6 a.d 50-287/72 h

(Murphy)

cc v/ encl. 2:

,

1

J. G. Keppler, RO

RS AD For Safety and Security Stds. (3)

L Asst. Director for Boil. Water Reactors (2)

L Asst. Director for Press. Water Reactors (2)

L Asst. Director for Operating Reactors (3)

-

L Asst. Director for Site Safety (2)

,

RO Office of Operations Evaluation

RO Asst. Dir. for Procedures

RO Asst. Dir. for Inspection & Enforcement

RO Files

DR Central Files

1911210lff

9