ML19322A637
| ML19322A637 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/15/1971 |
| From: | Jennifer Davis US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Thies A DUKE POWER CO. |
| Shared Package | |
| ML19256D297 | List: |
| References | |
| NUDOCS 7911210705 | |
| Download: ML19322A637 (2) | |
Text
_, _,
e
.(*
500bi a
C_,. +>c.,,
?
A s g, umra mT:s g
'.u M
urOMIC ENERGY COMMISSION olvisICN oF COMPLIANCE:
gg /fQ jg REGich d - SU.T E 818 d
'j3 g'g' 230 PE AO iTREE $?R EET N CA T H W E ST Tm MHSM
- Nil D AT1.ANTA Gd:RGIA 30303 May 15, 1971 Q e Power Company Attn:
Mr. A C. Thies, Vice President Production and Operation Power Building 422 South Church Street Charlotte, North Carolina 28201 3entle=en:
This letter relates to the discussions Messrs. C. E. Murphy, R. F. Warnick and H. L. Ynitener of this office held with Messrs. J. C. Rogers, D. G.
Bea=, J. E. Smith, J. W. Esspton and G. L. Hunnicutt of your staff at the conclusion of the inspection conducted on May h through 7,1971, regarding construction activities autherized by AEC Construction Per=it No. CPPR-33.
As noted during the discussions, certain items were identified which apparently were not in confor=ance with Appendix B to 10 CFR 50, " Quality Assurance Progra= for Nuclear P0ver Plants," as identified belov, or which
=ay otherwise r.lise questions concerning the adequacy of the construction.
These ite=s are as follows:
1.
Appendix B to 10 CFR 50, Criterien XI, states in part, "A test progra=
shall be established to assure that all testing required to demonstrate that structures, syste=s, and ec=ponents will perform satisfactorily in service is identified and performed in accordance with written test precedures.
Test results shall be documented and evaluated to assure that test require =ents have been satisfied."
Contrary to this require =ent, the inspectors observed lack of adequate
-test control. The reacter inspectors reviewed four test procedures, TP 200 16 - Reactor Coolant System Cleaning, TP 201 2 - Core Flood Tanks Hydro Test, TP 202 8 - High Pressure Injection System Flush, and TP 203 7 - Lov Pressure Injection and Core Ficod Syste= Flush. Three of the four procedures reviewed contained changes which were not made in accordance with Duke Pcver Co=pany's approved " Guide for Conducting the Oconee Initial Test Program."
7s11:2076 7
'r)
~
Nh Tc;te so=pany May 15, 1971 The procedure for cleaning tha reacter coolant systen did not contain sufficient test result documentatien to veiiff that the acceptance criteria had been satisfactorily =ct.
A timely review of the test results of the c1 caning of the reactor coolant syste= had net been conducted even though the reactor vescel head was ready to be installed.
2.
Critorien XVIII ::tates in p rt, "A cc=prehensive systc= cf pl=ned and periccic audios :V!' to carried out to varib/ cenplicace with all cspects of the quality cssuranco progres. cad to deter =ine the effective '
ness of the progres...."
\\
Contrary to this require = cat, the reacter inspectors could find no evidance of audits tsving been ccaducted to insure that testa cre per-forced according to vritten test precedures and in accordance -ith Duke. '
Pcwer Compc=y's "Guida for Conducting the Ccenee Initial Test Progras."
Plec e provide us, within 30 day:, with reur con =cnts concerning these ite=2 and cny steps which have bacn tt%en er vill be taken to correct then cnde to minimize recurrence including any :;propriata chan;;es that have been or vill be made to increase tne effectiveness of your quality assurance progr:n.:
Should you have any questions concerning this matter, you may cor=unicate directly with this office.
Very truly yours, s
Original Signed by.
~
J G Davis N
John G. Davis CO::I:T74 Eirector bec: