ML19321A611

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-277/79-30 & 50-278/79-33 on 791201-31 & Notice of Violation,Apps a & B
ML19321A611
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/21/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19321A602 List:
References
NUDOCS 8007230730
Download: ML19321A611 (3)


See also: IR 05000277/1979030

Text

N-

ne'.

~

y

,

UNIT ED ST AT ES

p

D

NUCLEAR REGULATORY CoMMisslON

p

o

,

REGION I

.i

g

-_'3

$31 PARK AVENUE

,

g

KING OF PR USSI A, PENNSYLVANI A 19406

y * * * * * * ~~

' APR 21 1980

' Docket Nos. 50-277

50-278

Philadelphia' Electric Company

ATTN: Mr. S. L. Daltroff~

Vice President

Electric. Production

>

2301 Market Street

-Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Combined Inspection 50-277/79-30 and 50-278/79-33

This refers to the inspection conducted by Mr. E. G. Greenman of this

office on December 1 - December 31, 1979 at Peach Bottom Atomic Power

Station,-Units 2 and 3, Delta, Pennsylvania and at the corporate offices

.in Philadelphia, Pennsylvania of activities authorized by NRC License

Nos. DPR-44 and DPR-56 and to the discussions of our findings held by

Mr. Greenman with Mr. W. T. Ullrich of your staff at the conclusion of

the-inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with

this letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Based on the results of this inspection, it appears that certain of

your activities were not conducted in full compliance with NRC require-

ments, as set.'forth in-the Notices of Violation, enclosed herewith as

. Appendices A and B.

These items of noncompliance have been categorized

into the levels as described in.our correspondence to you dated December

31, 1974. This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's -" Rules of Practice," Part 2, Title 10, Code

- of Federal . Regulations.

Section 2.201 requires you to submit to this

-

office, within twenty (20) days. of your receipt of this notice, a

written statement or explanation in reply including:

(1) corrective

steps which have been taken by you and the results Ochieved; (2)-corrective

i

steps which will be taken to avoid further items of noncompliance; and

(3) the date-when full compliance will be achieved.

.

8007230)20

.

y,

-

.,

'

!.

,

Phi 1'adelphia Electric' Company

2

APR 21 1980

,

Items number A'(Appendix A) and the item (Appendix B), shown in the

Notices of Violation enclosed with this letter are recurrent or

uncorrected items.

In your response, please give these matters your

particular attention.'

In 'accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title -10, Code of Federal- Regulations, a copy of this letter and the

enclosures will be placed'in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to

~

.be proprietary, it is necessary that you make a written application

within 20. days to this office to withhold such information from public

disclosure. .Any such' application must be accompanied by an affidavit

executed by the owner of the information, which identifies the document

or part sought to be withheld, and which contains a statement of reason;

which addresses with specificity the items which will be considered by

the Commission as listed in subparagraph (b) (4) of Section 2.790. The

information sought to be' withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

. regard within the-specified period, the report will be placed in the

Public Document Room.

Additionally, and in accordance with Section 2.790(d) of the NRC's

,

" Rules _ of. Practice," Part 2, Title 10, Code of Federal Regulations,

documentation of findings of your control and accounting procedures for

safeguarding special nuclear materials and your facility security

procedures are exempt from disclosure; therefore, the pertinent section

.

of the inspection report and Appendix B, will not be placed in the Public

Document Room and will receive limited distribution.

c

Should you have any questions concerning this inspection, we will be

l

pleased to discuss them with you.

j

Sincerely,

i:

90.kObh.,k

'

Eldon J. Brunner, Chief

'

Reactor Operations and fluclear

Support Branch

p

L

Enclos~ures:

1.

Appendix A, flotice of Violation

2.

Appendix B, l'otice of Violation *

-3.

Office.of-Inspection and Enforcement Combined Inspection Report

flumbers 50-277/79-30'and 50-278/79-33*

u

ll

u

q

>

,

>

-

,

,

,

~ ' '

, , ,.

,

~ Philad=lphia Electric Company

-3

APR 21 1980.

!

'

!

.cc: .

6

' W. T. Ullrich,' Station Superintendent (w/o' Pg. 5 of Report and Appendix B)*-

I

.

- Troy B. Conner, Jr., Esquire' (Without Report) (Without Appendix B)*

.

Eugene J. Bradley, Esquire (Without Report) (Without Appendix B)*

Raymond L.. Hovis, Esquire (Without Report) -(Without Appendix B)*'

Michael ~J. Scibinico, II, Assistant Attorney General (Without Report)

(WithoutAppendixB)*-

d

  • fContains'2.790 Information

,

!.

.

i

i

+

,

,

.

+

~i

,

i

!~

1.

~!.

. . _

. . .

__

_

_

_ , _

.

._

_

.