APPENDIX A O

NOTICE OF VIOLATION Philadelphia Electric Company Docket Nos. 50-277 50-278 Based on the results of an NRC inspection conducted on December 1-31, 1979, it appears that certain of your activities were not conducted in full compliance with conditions of your NRC Facility License Nos. DPR-44 and DPR-56 as in-dicated below.

Item A is an infraction and Item B is a deficiency.

A.

Technical Specification 6.11, " Radiation Protection Program", requires that procedures for personnel radiation protection shall be prepared consistent with requirements of 10 CFR Part 20 and shall be approved, maintained, and adhered to for all operations involving personnel exposure.

Health Physics Procedure HOP /CO-4, " Radiation Work Permits", revision 14, dated September 24, 1979,Section III states in part... "The re-sponsibility for following the requirements of the RWP will be accepted by each individual when he signs in on the RWP"....

RWP 2-94-0628A dated November 10, 1979, issued for decontaminating and painting planking in the Unit 2 RBCCW Room states that taped openings are required under anti-contamination requirements.

Contrary to the above requirements, on December 11, 1979, one individual who had signet. in on RWP 2-94-0628A was observed working in the painting area, a contaminated area, with untaped open coveralls. (Recurrent item).

B.

Technical! Specification 6.8.1 requires in part:

" Written procedures and admini:trative policies shall be established, implemented, and maintained...". Procedure ST 7.2.3.C, " Analysis of the Time Reactor Water Chloride and Conductivity are Above Limits", revision 1, dated May 9, 1979, step 0.1. states in part:

" Enter ' running totals' from the previous week on~ fitit line of data sheet".

Contrary to the above, during performance of the referenced surveillance tests on Units 2 and 3 on October 9,1979 (week 79-4-1), all zeros, rather than the actual running totals were recorded on the first line of the data sheet for each unit.