Forwards IE Insp Repts 50-324/80-10 & 50-325/80-11 on 800331 & 0401-03 & Notice of Violation
ML19320B443
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/18/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML19320B424 List:
References
NUDOCS 8007100384
Download: ML19320B443 (2)


See also: IR 05000324/1980010

Text

.

. ..

. - -

_ _

. . . _ _ .

_ _..

m.

.

  1. m

o

UNITED STATES

-

!

g

NUCLEAR REGULATORY COMMISSION

o

$

'I

REGION 11

'

0,

8

101 MARIETTA ST N.W SUITE 3100

ATLANTA, GEORGIA 30303

          • g

APR 181980

In Reply Refer To:

RII:WHM

50-324/80-10

,

50-323/80-11

Carolina Power and Light Company

ATTN:

J. A. Jones

,

Senior Executive Vice President and

Chief Operating Officer

411 Fayetteville Street

.

Raleigh, NC 27602

.

Gentlemen:

l

This refers to the inspection conducted by W. H. Miller, Jr., of this office on

'

'

I

March 31 and April 1-3, 1980 of activities authorized by NRC Operating License

Nor.. DPR-62 and DPR-71 for the Brunswick facility, and to the discussion of our

findings held with A. C. Tollison, Jr. , at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

i

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

.

We have examined actions you have taken with regard to previously identified

,

enforcement ratters and unresolved items. The status of these items is discussed

i

in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

'

1

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

.

,

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

j

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

y

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this not!ce, a written statement or explanation in reply including:

,

(1) corrective steps which have been taken by you and the results achieved; (2)

e

corrective steps which will be teken to avoid further noncompliance; and (3) the'

date when full compliance will be achieved.

-

f

During the inspection it was found that certain activities under your license

appear to deviate from commitements to the Commission and have safety significance.

}

This item identified in the Notice of Deviation enclosed herewith as Appendix B.

t

Please provide us in writing within 20 days of your receipt of this letter your

i

comments including a description of corrective actions that have been or will be

taken, corrective actions which will be taken to avoid further deviations, and

i

the date corrective actions were or will he completed.

I

a

i

3

8007

l

' D$h

-.

-

..

_ _

- . _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

.

.

.

Carolina Power and Light Company

-2_

APR 181980

.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, C ef

Reactor Construction and Engineering

Support Branch

Enclosure:

1.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Deviation

3.

Inspection Report Nos. 50-324/80-10

and 50-325/80-11

cc w/ encl:

A.

C. Tollison, Jr.

Plant Manager

Box 458

Southport, NC 28461

. - -