ML19319D799

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-312/72-02 on 720627-30 & Notice of Violation
ML19319D799
Person / Time
Site: Rancho Seco
Issue date: 07/28/1972
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19319D786 List:
References
NUDOCS 8003250794
Download: ML19319D799 (3)


See also: IR 05000312/1972002

Text

--

- . . - .

.

.

'

.

.

,.

jy

UNITED STATES

ATOMIC ENERGY COMMISSION

g-

.r)

  • +,%

DIRECTO R ATE OF REGU LATORY OPER ATIONS

,['

,

, -

REG 40NV

'/ *

2111 B ANCROFT WAY

0,

BER KELEY, CALIFORrel A 94704

,,,,

,,,,,,,,,g

s av. es e

ff

JUL 2 81972

J. B. Henderson, Chief

Reactor Construction Branch, RO:HQ

SACRAMENTO MUNICIPAL UTILITY DISTRICT (RANCHO SECO)

CONSTRUCTION INSPECTION

DOCKET NO. 050-0312

The attached report of a routine, unannounced inspection of construction

activities at the site of the subject project on June 27-30, 1972 is forwarded

for information. One item of nonconformance was identified during the

inspection. This item concerns inspection methods used by the Electrical

Department .mich classifies nonconformance problems as field inspection

correctfans to shortstop nonconformance reports. This is a direct violation

of the licensee's QA procedure. Inunediate corrective action is expected.

We confirmed that satisfactory corrective action has been taken on all of

the itema discussed in our letter to the licensee dated May 4, 1972 and that

the actions on apparent items of nonconformance were as described in the

,

licensee's response dated May 30, 1972.

The report contains the status of the following items:

1.

Investigation of Weld Root Pass " Imperfections".

(Section I)

2.

Cracks in Lateral Support Rings for Steam Generators (Section I and II,

Paragraph 8.)

3.

Control Rod Drive Pressure Tubes (Section I and II, Paragraph 10.)

A review of the NCR system showed a weakness in the implementation of

corrective action for nonconformances. While many of the NCRs (Nonconforming

Reports) written on discrepancies would not be considered "significan.:", the

lack of cause and corrective action determinations indicates a definite

weakness-in nonconforming material control. We take the position that

emphasis on such cause and corrective action mst be directed toward those

conditions, procedures and management systems that allowed the discrepancy

,

to occur, rather than reiterating a description of the fault and its

disposition which are covered elsewhere on the report form. SMUD agreed to

make a thorough review of their NCR system, including the categorization of

disposition actions as well as cause and corrective action. This item will

be reviewed further during the next inspection.

$1 ?. .

rk f, /$r

G. S. Spencer, Chief

Reactor Construction and Operations Br.

%

8003250 N f

.

_

. --

.

_

.. -

. - . . _ .

.. ..

-

-

_ _ . . - _ . - _ .

_ _ _ _ _ .

.

_

O

. ,

.

.

-.

,

i

d

J. B. Henderson

-2-

$ 281972

Enclosure:

<

RO Inspection Rpt No 050-0312/7202

by R. T. Dodds

j

cc w/ encl:

.

RS, AD for Safety and Security Stds. (3)

-

i

L AD for Boil. Water Reactors (2)

L AD for Press. Water Reactors (2)

4

l

L AD for Operating Reactors (3)

L AD for Site Safety (2) .

j

KO Office of Operations Evaluation

RO AD for Procedures

'

j

RO ad for Inspection & Enforcement

1

RO Files

l

DR Central Files

i

l

a

l

1

f

,

i

!

i

i

i

$

i

4

.

!

E

f

f

4

.

3

a

!

. .

.

.

.

.

.

.

.

.

.

.

. .

. _ . . , _ . , . . . . . . . , . . . . _ . _ _ _ _ _ , . . . , . . . . _ , , _ .

_ , - . , _ _ . _ _ _ , .

_ _ _ . _ .

.

i

D1 BORATE OF REGULATORY OPERATIOh

O

MONTHLY REPORT JULY 1972

-

V

1

l

Sacramento Municipal Utility District (Rancho Seco) - An RO

~1nspection was conducted on June 27-30 to review electrical

installation work and welding in Class I systems and components.

One deficiency, involving the failure to properly review and

document departures from the electrical cable routing and

termination specifications, was identified and was incorporated

in a Regional enforcement letter.

O

Some of the pressure. tubes for tne control rod drives shipped

to Royal Industries, Santa Ana, California, for UT examination

4

were found to have thin walls.

B&W is preparing a topical

report for submittal to the AEC on this problem.

RO will follow

up on this matter.

J

f

oi*

.

()r

.y

e .,

i

.

_.