ML19319D812
| ML19319D812 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 07/27/1972 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML19319D786 | List: |
| References | |
| 50-312-72-02, 50-312-72-2, NUDOCS 8003250805 | |
| Download: ML19319D812 (1) | |
Text
__
-l
)
y ).
l Sacramento Municipal Utility District,
!. Docket No. O'n-0312 l
.I Certain' activities under your construction permit appear to be in nonconfor.
t 7, )
mance with statements in your Final Safety Analysis Report, as identified below:
1 ' '.
' l.
Appendix 1.B.l.15 of the Final Safety Analysis Report and your Quality Assurance Procedure Number 17 require that all departures (with the exception of minor rework within n short period of time) from drawing, specification or procedure requiremencs must be documented on a Nonconforming Report and properly dispositioned.
i 4
i s
1 Contrary to the above requiremonen, departures from electrical cable routing and termination specifications that were identified by your
.I
,, Management Inspector were not being documented on Nonconforming Reports.
g t
.i.
'"9.
1 i
4.,
i.
l
'.., F i.
i 1:
l f
I l
l
- i h
j
,-i t
4 i
i I
t t
+
i 1:
I 1
l
+
i, I
f i
o I
ENCLOSURE j
i e
I l
a I.'. j 18o(>3250[o5' f
~
i.,
v n