ML19319C964
| ML19319C964 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/12/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19319C951 | List: |
| References | |
| NUDOCS 8003040899 | |
| Download: ML19319C964 (2) | |
See also: IR 05000302/1978016
Text
- - .
0',
n'
UNITED ST ATES
]
g8 "8 %g'o
NUCtEAR REGULATORY COMMISSION
,
g % ^,.,(), g
,
REcioNii
)
e
o
%
E
230 PE ACHTREE STREET. N.W. sulTE 1217
id
- k
!
ATLANTA, GEORGI A 30303
s w [* /
o,
~g'
JUL 121978
-
In Reply Refer To:
RII:RHW
-
50-302/78-16
EWcon
Florida Power Corporation
Atta:
Mr. W. T. Stewart
Director of Power Production
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida
33733
Gentlemen:
This refers to the inspection conducted by Mr. R. H. Wessman of this
office on June 12-15, 1978, of activities authorized by NRC License
No. DPR-72 for the Crystal River 3 facility, and to the discussion of
our findings held with Mr. G. P. Beatty, Jr. at the conclusion of the
inspection.
,
Areas examined during the inspection and our findings are discussed in the
~
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspectors.
During this inspection it was found that certain activities under your
,
license appear to be in noncompliance with NRC requirements. This
item and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved. With regard to
_:
item D corrective actions to prevent recurrence were completed prior to
1
conclusion of this inspection; therefore, a reply is not requested for
this item.
l
,O
bj
)
8003040
f
,
9
,y
,
x
)
Florida Power Corporation
-2-
adL 121378
..
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
-
and the enclosed inspection report will be placed in the NRC's Publie
,
'
Document Room.
If this report contains any information that you (or
.
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
,
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning tnis letter, we will be glad to
discuss them with you.
Sincerely,
Y
-w
F. J. Long, Chief
O
Reactor Operations and
~
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No.
50-302/78-16
cc w/ enc 1:
Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida 32629
- .
-
(
,
_
- - - - - - ,
-
_
_ , _ _ . _
-.
,-
. _ -
- - -
--,.w,-
c -