ML19319C952
| ML19319C952 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/26/1977 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19319C953 | List: |
| References | |
| NUDOCS 8003040890 | |
| Download: ML19319C952 (2) | |
See also: IR 05000302/1977013
Text
_______________________ - - _ _ __
- - _ ______ _ ___
___ - _- _
. _ _ _ _ _ _ _ _ _ _ - _ _ _ . - _ _
_ _ _ _ - _ _ _ _ _ _ - _ _ _
'
g
..
.
-
- .
3
3
,m
-
'
'
.
\\.'
gn ago
',
UNITEo STATES
o,,
NUCLEAR REGULATORY COMMISSION
2
o
REGloN 11
~(E FILE COPY
{-
., #$
230 PEACHl REE STREET N.W. SUITE 1217
o
ATLANTA, GEORGIA 30303
'%.."..'.
SEP 2 01377
-
-
In Reply Refer To:
RII:HLW
50-302/77-13
-
'
.
...
Florida Power Corporation
Attn:
Mr. W. P. Stewart
Power Production
~
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
'
- This refers to the inspection conducted by Mr. H. L. Whitener of this
.
office on July 20-22 and August 2-5, 1977, of activities authorized by
NRC Operating License No. DPR-72 for the Crystal River Unit 3 facility,
and to the discussion of our findings held with Mr. G. P. Beatty, Jr.,
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
'
consisted of selective eynminations of procedures and representative
records, interviews with personnel, and observations by the inspector.
We have examined acticas you have taken with regard to previously
identifled inspection findings. These are discussed in the enclosed
inspection report.
During the inspection it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item
and references to pertinent requirements are listed in the enclosed
Notice of Violation. Corrective actions to prevent recurrences were
completed prior to the conclusion of this inspection;.therefore, a reply
to this item of noncompliance is not requested.
-
In accordance with Section 2.790 of the NRC's " Rules of Practica",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
'
and the enclosed inspection report will be placed in the NRC's Public
Doctment Room. If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that ycu
.
s.
.
make a written application within 20 days to this office to withhold
,
such information from public disclosure. Any such application must
-
include a full statement of the reasons on the basis of which it is
p
claimed that the information is proprietary, and should be prepared so
(
that proprietary information identified in the application is contained
.
.
f
8003040
Q
O
'
-
..
__.
-
_
_
-
_______ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
.
j a
.
. .
.
7
-
-
, _
3
.
Florida Power Corporation
-2-
,
in a separate part of the document. If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Very truly yours,
,, J
__
Long
'
Reactor Operations and Nuclear
-
,
Support Branch
-
Enclosures:
.
-
1.
Appendix A, Notice of
Violation
2.
RII Inspection Report No.
.
-
50-302/77-13
cc:
Mr. G.
'. Beatty, J: .
Nuclear Plant Superintendent
P. O. Box 1226
Crystal-River, Florida . 32629
-
.