ML19319C952

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/77-13 on 770720-22 & 0802-05 & Notice of Violation
ML19319C952
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/26/1977
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19319C953 List:
References
NUDOCS 8003040890
Download: ML19319C952 (2)


See also: IR 05000302/1977013

Text

_______________________ - - _ _ __

- - _ ______ _ ___

___ - _- _

. _ _ _ _ _ _ _ _ _ _ - _ _ _ . - _ _

_ _ _ _ - _ _ _ _ _ _ - _ _ _

'

g

..

.

-

  • .

3

3

,m

-

'

'

.

\\.'

gn ago

',

UNITEo STATES

o,,

NUCLEAR REGULATORY COMMISSION

2

o

REGloN 11

~(E FILE COPY

{-

., #$

230 PEACHl REE STREET N.W. SUITE 1217

o

ATLANTA, GEORGIA 30303

'%.."..'.

SEP 2 01377

-

-

In Reply Refer To:

RII:HLW

50-302/77-13

-

'

.

...

Florida Power Corporation

Attn:

Mr. W. P. Stewart

Power Production

~

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

'

- This refers to the inspection conducted by Mr. H. L. Whitener of this

.

office on July 20-22 and August 2-5, 1977, of activities authorized by

NRC Operating License No. DPR-72 for the Crystal River Unit 3 facility,

and to the discussion of our findings held with Mr. G. P. Beatty, Jr.,

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

'

consisted of selective eynminations of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have examined acticas you have taken with regard to previously

identifled inspection findings. These are discussed in the enclosed

inspection report.

During the inspection it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item

and references to pertinent requirements are listed in the enclosed

Notice of Violation. Corrective actions to prevent recurrences were

completed prior to the conclusion of this inspection;.therefore, a reply

to this item of noncompliance is not requested.

-

In accordance with Section 2.790 of the NRC's " Rules of Practica",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

'

and the enclosed inspection report will be placed in the NRC's Public

Doctment Room. If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that ycu

.

s.

.

make a written application within 20 days to this office to withhold

,

such information from public disclosure. Any such application must

-

include a full statement of the reasons on the basis of which it is

p

claimed that the information is proprietary, and should be prepared so

(

that proprietary information identified in the application is contained

.

.

f

8003040

Q

O

'

-

..

__.

-

_

_

-

_______ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

.

j a

.

. .

.

7

-

-

, _

3

.

Florida Power Corporation

-2-

,

in a separate part of the document. If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Very truly yours,

,, J

__

Long

'

Reactor Operations and Nuclear

-

,

Support Branch

-

Enclosures:

.

-

1.

Appendix A, Notice of

Violation

2.

RII Inspection Report No.

.

-

50-302/77-13

cc:

Mr. G.

'. Beatty, J: .

Nuclear Plant Superintendent

P. O. Box 1226

Crystal-River, Florida . 32629

-

.

4

e

a

e

b

l

.

.

.

.

,

.

e

G

6

,

,,

e

g

, - e

m=

e

1

w

-a--

c

--y

v

e,e-

,

_ __. ,

%

-

%.

-

g