ML19319C742

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept Re Omission of Weld Detail in Nuclear Svc Sea Water Piping.Placement of Piping Verified & Corrective Action Initiated to Preclude Recurrence
ML19319C742
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/27/1973
From: Rodgers J
FLORIDA POWER CORP.
To:
Shared Package
ML19319C737 List:
References
NUDOCS 8003030857
Download: ML19319C742 (1)


Text

v

'a

,,c oo.e ywm 44

_ g )0 t.

303 r

0 7

8 gg" 4

w/.s t '

~ 4oe M

December 27, 1973 C O R 9 0 n s, e n ee knald F. Knuth, Director Tle Directorate of Regulatory Operations U. S. Atomic Energy Commission Washington, D. C.

20545

Subject:

Crystal River Plant - Unit #3 Docket No. 50-302

Dear Mr. Knuth:

In accordance with Federal Regulation 10CFR50.55e, we wish to submit the final report concerning the nonconfomance reported to you on November 9, 1973. This nonconformance occurred during the installation of the Nuclear Service Sea Water Piping. The final disposition.of the installed piping has been made and it has been established that the subject piping can remain in place. The documentation that verifies the actions

/^N taken by the Site Construction and Quality Organizations and the subsequent (O

)

correspondence with Gilbert Associates, Inc. Engineering personnel are on file at the Site Generation Quality and Standards Office for perusal by your inspectors.

As mentioned in our November 9th letter, corrective action has been initiated to preclude the re-occurrance of this type of nonconformance.

We hope that this will close this item of nonconfomance. Please advise us if you require any further information.

Very truly yours,

(

r,-

y JTR: ldh FLORIDA POWER CORPORATION J. T. Rodgers cc: Norman C. Moseley Assistant Vice President Director, Region II DRO l

n L.

  • Im rmC

([ U8508 Osa D Q [,Cv3 General Office 3201 Thirty-fourtn street soutn. P.O Box 14042, st. Petersburg. Flonda 33733 813-866-5151

.