ML19319C742
| ML19319C742 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/27/1973 |
| From: | Rodgers J FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML19319C737 | List: |
| References | |
| NUDOCS 8003030857 | |
| Download: ML19319C742 (1) | |
Text
v
'a
,,c oo.e ywm 44
_ g )0 t.
303 r
0 7
8 gg" 4
w/.s t '
~ 4oe M
December 27, 1973 C O R 9 0 n s, e n ee knald F. Knuth, Director Tle Directorate of Regulatory Operations U. S. Atomic Energy Commission Washington, D. C.
20545
Subject:
Crystal River Plant - Unit #3 Docket No. 50-302
Dear Mr. Knuth:
In accordance with Federal Regulation 10CFR50.55e, we wish to submit the final report concerning the nonconfomance reported to you on November 9, 1973. This nonconformance occurred during the installation of the Nuclear Service Sea Water Piping. The final disposition.of the installed piping has been made and it has been established that the subject piping can remain in place. The documentation that verifies the actions
/^N taken by the Site Construction and Quality Organizations and the subsequent (O
)
correspondence with Gilbert Associates, Inc. Engineering personnel are on file at the Site Generation Quality and Standards Office for perusal by your inspectors.
As mentioned in our November 9th letter, corrective action has been initiated to preclude the re-occurrance of this type of nonconformance.
We hope that this will close this item of nonconfomance. Please advise us if you require any further information.
Very truly yours,
(
r,-
y JTR: ldh FLORIDA POWER CORPORATION J. T. Rodgers cc: Norman C. Moseley Assistant Vice President Director, Region II DRO l
n L.
- Im rmC
([ U8508 Osa D Q [,Cv3 General Office 3201 Thirty-fourtn street soutn. P.O Box 14042, st. Petersburg. Flonda 33733 813-866-5151
.