ML19319C738

From kanterella
Jump to navigation Jump to search
Action Control Form CDR 200 Requesting Evaluation of Util 731109 Deficiency Rept on 731113 Re Nuclear Svc Sea Water Piping
ML19319C738
Person / Time
Site: Crystal River 
Issue date: 02/14/1974
From: Jennifer Davis
US ATOMIC ENERGY COMMISSION (AEC)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19319C737 List:
References
CDR-200, NUDOCS 8003030853
Download: ML19319C738 (1)


Text

.

O O*

TSt.t> /,CTIO!: C0':T?or.

R't A.

Action Cou2 CDR.9200 Name of Licenace end Facility Florida Power Co (Crystal River)

Docket No. or License No.

50-302 Titic CDR Evaluation and Followup CDP' Origin Date Rec'd 11/13/73 4

B.

FS6EB Branch Coordinator:

Bryan,

Dreher Ellin Paulus X

Cocpict,1on Requested by C.

Action Requested of:

ADPiMP M&PPOB EPB RPB ADC0

-CB CB TA3 00E Region II Date Regue :cd 11/20/73 Completion Requested by.

Reference Letter dated 11/9/73 froh Rodcors to Kruesi.

O D.

Action Requested In.accordance with PI 0600/6, "Constrteion Deficiency Reporting,"

i the Fidrida Power Co. (Crystal River 1) deficiency rc. port of 11/9/73 i

regarding the fluclear Service Sea Water Piping is being assigned j

to Region II for evaluation of the technical adequacy of the corrective action and the final resolution of the deficiency.

i E.

Date Action Co=pleted 2/lk/Th Close-out (Date & Method) Memorandum of 2/1h/7h, F. J. Long to Co =cnts: If coepiction date is not consistent k tk*y hr N : schedule, E

please let us know.

sh,.,

ihn G. Davis, Deputy Director for Field Operations

[]

Directorate of Regulatory Operatiens

(/

I l

8003036853 o'

S

\\

\\

w

-a