ML19319C738
| ML19319C738 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/14/1974 |
| From: | Jennifer Davis US ATOMIC ENERGY COMMISSION (AEC) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19319C737 | List: |
| References | |
| CDR-200, NUDOCS 8003030853 | |
| Download: ML19319C738 (1) | |
Text
.
- O O*
TSt.t> /,CTIO!: C0':T?or.
R't A.
Action Cou2 CDR.9200 Name of Licenace end Facility Florida Power Co (Crystal River)
Docket No. or License No.
50-302 Titic CDR Evaluation and Followup CDP' Origin Date Rec'd 11/13/73 4
B.
FS6EB Branch Coordinator:
Bryan,
Dreher Ellin Paulus X
Cocpict,1on Requested by C.
Action Requested of:
ADPiMP M&PPOB EPB RPB ADC0
-CB CB TA3 00E Region II Date Regue :cd 11/20/73 Completion Requested by.
Reference Letter dated 11/9/73 froh Rodcors to Kruesi.
O D.
Action Requested In.accordance with PI 0600/6, "Constrteion Deficiency Reporting,"
i the Fidrida Power Co. (Crystal River 1) deficiency rc. port of 11/9/73 i
regarding the fluclear Service Sea Water Piping is being assigned j
to Region II for evaluation of the technical adequacy of the corrective action and the final resolution of the deficiency.
i E.
Date Action Co=pleted 2/lk/Th Close-out (Date & Method) Memorandum of 2/1h/7h, F. J. Long to Co =cnts: If coepiction date is not consistent k tk*y hr N : schedule, E
please let us know.
sh,.,
ihn G. Davis, Deputy Director for Field Operations
[]
Directorate of Regulatory Operatiens
(/
I l
8003036853 o'
S
\\
\\
w
-a