ML19319C736
| ML19319C736 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/14/1974 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Thornburg H US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19319C737 | List: |
| References | |
| NUDOCS 8003030852 | |
| Download: ML19319C736 (1) | |
Text
,
\\
h* X,i '*r;b.
UNITED STATES
'a 'i ATOMIC ENERGY COMMISS:CN
(;,3.c,,.).')
l.:f.
n,1;a,c. c n,;;.u~m wwc:c:::
a e 2 0,.
w., e i.,
q, r,.. x x.. e. u w... m... ~
s.-
a r.. ~ r, a c u c, a wx3 FEB 141974 H. D. Thornburg, Chief, Field Support and Enforcement Branch Directorate of Regulatory Operations, Headquarters FLORIDA POWER CORPORATION (CRYSTAL RIVER UNIT 3), DOCKET NO. 50-302, FINAL REPORT ON NUCLEAR SERVICE SEA WATER PIPING (10 CFR 50.55 (e))
Florida Power Corporation's (FPC) final report on this subject was received, reviewed and evaluated. The report documentation that verifies the action taken by the site construction and quality organization, leading to the final disposition of the piping; and that the piping may remain in place; is deemed adequate action.
This is being carried in the docket file as unresolved item 73-11/1, Sea Water Discharge Pipe Joints and is being closed on R0 Report No.
50+302/74-3.
g A
^
v Y. Long, ief RO:II:EJV Facilities Construction Branch cc: J. D. Henderson, RO:HQ W. A. Crossman, RO:II
~
E. J. Vallish, RO:II
+
8003030 M c'
.