ML19319C736

From kanterella
Jump to navigation Jump to search
Submits Evaluation of Deficiency Rept Re Nuclear Svc Sea Water Piping.Util Action Deemed Adequate
ML19319C736
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/14/1974
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thornburg H
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19319C737 List:
References
NUDOCS 8003030852
Download: ML19319C736 (1)


Text

,

\\

h* X,i '*r;b.

UNITED STATES

'a 'i ATOMIC ENERGY COMMISS:CN

(;,3.c,,.).')

l.:f.

n,1;a,c. c n,;;.u~m wwc:c:::

a e 2 0,.

w., e i.,

q, r,.. x x.. e. u w... m... ~

s.-

a r.. ~ r, a c u c, a wx3 FEB 141974 H. D. Thornburg, Chief, Field Support and Enforcement Branch Directorate of Regulatory Operations, Headquarters FLORIDA POWER CORPORATION (CRYSTAL RIVER UNIT 3), DOCKET NO. 50-302, FINAL REPORT ON NUCLEAR SERVICE SEA WATER PIPING (10 CFR 50.55 (e))

Florida Power Corporation's (FPC) final report on this subject was received, reviewed and evaluated. The report documentation that verifies the action taken by the site construction and quality organization, leading to the final disposition of the piping; and that the piping may remain in place; is deemed adequate action.

This is being carried in the docket file as unresolved item 73-11/1, Sea Water Discharge Pipe Joints and is being closed on R0 Report No.

50+302/74-3.

g A

^

v Y. Long, ief RO:II:EJV Facilities Construction Branch cc: J. D. Henderson, RO:HQ W. A. Crossman, RO:II

~

E. J. Vallish, RO:II

+

8003030 M c'

.