f.
'
- r
,
UNITED STATES
p regD
NUCLEAR REGULATORY COMMisstON
4
o
$
REGION I
!!
/ $
631 PARK AVENUE
KING OF PRUSSIA, PENNSYt.VANIA 19404
,jf g gg
% *...* $
Docket Nos. 50-289
50-320
Metropolitan Edison Company
ATTN: Mr. R. C. Arnold, Sr.
Senior Vice President
100 Interpace Parkway
'
Parsippany, New Jersey 07054
Gentlemen:
Sub,iect: Combined Inspection 50-289/79-19 and 50-320/79-25
This refers to the inspection conducted by Mr. R. E. Shepherd of this office on
September 16-21, 24-28, and October 2-4, 1979 at Three Mile Island Nuclear
Station, Units 1 and 2 of activities authorized by NRC License Nos. DPR-50 and
DPR-73 and to the discussions of our findings held by Mr. Shepherd with Mr. G.
Miller and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that certain of your activi-
ties were not conducted in full compliance with NRC recuirements, as set forth
in the Notice of Violation, enclosed. herewith as Appencix A.
These items of
noncompliance have been categorized into the levels as described in our corres-
pondence to you dated December 31, 1974.
This notice is sent to you pursuant to
the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations.
Section 2.201 requires you to submit to this
office, within twenty (20) days of your receipt of this notice, a written state-
(1) corrective steps which have been
ment or explanation in reply including:(2) corrective steps which will be taian
taken by you and the results achieved;
to avoid further items of noncompliance; anj M) the date when full compliance
will be achieved.
'In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, documentation of findings of your control
and accounting procedures for safeguarding special nuclear materials and your
facility security procedures are exempt from disclosure; therefore, the enclosures
to this letter, and your response to this letter will not be placed in the
Public Document Room and will receive limited distribution.
.
8006090/(,0
Q
y.
- -
'
Metropolitan Edison Company
2
14 JAN T330
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Walter G. Martin, Chief
Safeguards Branch
Enclosures:
1.
~ Appendix A, Notice of Violation (Contains 2.79G Information)
2.
Office of Inspection and Enforcement Combined Inspection
Report Numbers 50-289/79-19 and 50-320/79-25 (Contains 2.790 Information)
cc w/ report cover sheet only:
J. G. Herbein, Vice President Nuclear Operations
G. P. Miller, Manager, Unit 1
J. J. Colitz, Manager Plant Engineering (TMI-1)
L. W. Harding, Supervisor of Licensing
E. G. Wallace, Licensing Manager
I. R. Finfrock, Jr.
R. W. Conrad
J. B. Lieberman, Esquire
G. F. Trowbridge, Esquiri
R. F. Wilson, Director,TMI-2
J. J. Barton, Manager Site Operations
B. Elam, Manager Plant Engineering (TMI-2)
Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment
.
e
,