Text
e
s
5
UNITED STATES
g"'y
,(pt**"800c,%
NUCLEAR REGULATORY COMMISSION
,
REGloN il
(
) s.( g g
230 PEACHTREE STREET, N.W. SUITE 1217
(
!
"p
- /~ "/
g
ATLANTA, GEORGI A 30303
o,
'
8
%, %,r
,o
JUN 1919M
In Reply Refer To:
RII:GTG
50-302/78-11
,
Florida Power Corporation
Attn:
Mr. W. P. Stewart
Power Production
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
This refers to the inspection conducted by Mr. G. T. Gibson of this
office on May 2-5, 1978, of activities authorized by NRC Operating
License No. DPR-72 for the Crystal River 3 facility, and to the dis-
cussion of our findings held with Mr. P. McKee at the conclusion of the
inspection.
m
Areas examined during the inspection and our findings are discussed in
1
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Ve have examined actions you have taken with regard to previously identified
These are discussed in the enclosed inspection
enforcement matters.
report.
Two new unresolved items resulted from this inspection and are discussed
in the enclosed report. These items will be examined during subsequent
inspections.
.
During the inspection it was found that certain activities under yoxr
This item
license appear to be in noncompliance with NRC requirements.
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A.
Corrective actions to prevent
-
recurrence were completed prior to the conclusion of this inspection;
therefore, a reply is not requested.
/"N
v
8 0 02 28o F 7f
g
.
-
.
'
JUN 19197B
'
fm
e
i
k_l
Florida Power Corp.
-2-
s
.
During the inspection it was found that certain activities under your
license appear to deviate from commitments to the Commission, and have
-
safety significance.
This item is identified in the Notice of Deviation
enclosed herewith as Appendix B.
Corrective actions to prevent recurrence
were completed prior to the conclusion of this inspection; therefore, a
reply is not requested.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room. If this report contains any information that you (or your contractor)
.
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold auch information
from public disclosure. Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
('~
Should you have any questions concerning this letter, we will be glad to
-
dircuss them with you.
Sincerely,
d
.
J. T. Sutherland, Chief
Fuel Fccility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3
Inspeition Report No. 50-302/78-11
cc w/ encl:
Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida 32629
9
.