e

s

5

UNITED STATES

g"'y

,(pt**"800c,%

NUCLEAR REGULATORY COMMISSION

,

REGloN il

(

) s.( g g

230 PEACHTREE STREET, N.W. SUITE 1217

(

!

"p

- /~ "/

g

ATLANTA, GEORGI A 30303

o,

'

8

%, %,r

,o

JUN 1919M

In Reply Refer To:

RII:GTG

50-302/78-11

,

Florida Power Corporation

Attn:

Mr. W. P. Stewart

Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by Mr. G. T. Gibson of this

office on May 2-5, 1978, of activities authorized by NRC Operating

License No. DPR-72 for the Crystal River 3 facility, and to the dis-

cussion of our findings held with Mr. P. McKee at the conclusion of the

inspection.

m

Areas examined during the inspection and our findings are discussed in

1

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Ve have examined actions you have taken with regard to previously identified

These are discussed in the enclosed inspection

enforcement matters.

report.

Two new unresolved items resulted from this inspection and are discussed

in the enclosed report. These items will be examined during subsequent

inspections.

.

During the inspection it was found that certain activities under yoxr

This item

license appear to be in noncompliance with NRC requirements.

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

Corrective actions to prevent

-

recurrence were completed prior to the conclusion of this inspection;

therefore, a reply is not requested.

/"N

v

8 0 02 28o F 7f

g

.

-

.

'

JUN 19197B

'

fm

e

i

k_l

Florida Power Corp.

-2-

s

.

During the inspection it was found that certain activities under your

license appear to deviate from commitments to the Commission, and have

-

safety significance.

This item is identified in the Notice of Deviation

enclosed herewith as Appendix B.

Corrective actions to prevent recurrence

were completed prior to the conclusion of this inspection; therefore, a

reply is not requested.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room. If this report contains any information that you (or your contractor)

.

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold auch information

from public disclosure. Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

('~

Should you have any questions concerning this letter, we will be glad to

-

dircuss them with you.

Sincerely,

d

.

J. T. Sutherland, Chief

Fuel Fccility and Materials

Safety Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Deviation

3

Inspeition Report No. 50-302/78-11

cc w/ encl:

Mr. G. P. Beatty, Jr.

Nuclear Plant Superintendent

P. O. Box 1228

Crystal River, Florida 32629

9

.

_.