Forwards IE Insp Rept 50-302/78-10 on 780424-28 & Notice of Violation
ML19317G264
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/16/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19317G257 List:
References
NUDOCS 8002280889
Download: ML19317G264 (2)


See also: IR 05000302/1978010

Text

- - . _

(

pskamark

UNITED STATES

,

,

8

,g

NUCLEAR REGULATORY COMMIS

M

, , ,

y ( )A

s->

%

REGloN il

p.

230 PE ACHTREE STR EET. N.W. SUITE 1217

/jg- ~ ' /p[r

(

,/

o,

ATLANTA, GEORGI A 30303

% *s.

,

.

MAY I 61978

In Reply Refer To:

RII:RHW

50-302/78-10

-

Florida Power Corporation

Attn:

Mr. W. P. Stewart

Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by Mr. R. H. Wessman of this

,

office on April 24-28, 1978, of activities authorized by NRC Operating

License No. DPR-72 for the Crystal River 3 facility, and to the discussion

of our findings held with Mr. G. P. Beatty, Jr. at the conclusion of the

inspection.

This refers also to a management meeting held April 27,

1978, at the Crystal River 3 site to discuss FPC-licensed activities,

review Crystal River 3 enforcement history and licensee events; review

O'

recent inspection results; and to discuss NRC organizational relationships

~

and communication philosophy.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report.

Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is

discussed in the enclosed report.

Two new unresolved items resulted from this inspection and are discussed

in the enclosed report.

These items will be examined during subsequent

1

inspections.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements.

This item

and references to pertinent requirements are listed in the Notice of

,

Violation enclosed herewith as Appendix A.

This notice is sent to you

l

i

I

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2. Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

'

l

this notice, a written statement or explanation in reply including:

(1)

'

q

corrective steps which have been taken by you and the results achieved;

1

Iv)

(2) corrective steps which will be taken to avoid further noncompliance;

'

and (3) the date when full compliance will be achieved.

8002 280 Nf

'

__ _

_ _ _

- ______

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

MAY 161978

.

O

. , .

.

'

Florida Power Corp.

-2-

,Di

O

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

.

application within 20 days to this office to withhold such information

,

from public disclosure. Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, ve will be glad to

discuss them with you.

Sincerely,

.

I..

M'

"

F. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

,

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/78-10

cc w/ encl:

1

Mr. G. P. Beatty, Jr.

Nuclear Plant Superintendent

P. O. Box 1228

Crystal River, Florida 32629