See also: IR 05000302/1977017
Text
,
_
w
s
N
[
>$ "Gug
UNITED STATES
(
jy
NUCLEAR REGULATORY COMMISSION
'
v
e
REGloN ll
~
{a
$
230 PEACHTREE STREET, N.W. SUtTE 1217
yy
8
ATLANTA. GEORGIA 30303
-
VUs I
g
%
31s/7
In Reply Refer To:
RII:RHW
50-302/77-17
Florida Power Corporation
.
Attu:
Mr. W. P. Stewart, Director
Power Production
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida
33733
i
Gentlemen:
'
This refers to the inspection conducted by Mr. R. H. Wessman of this
office on September 20-23, 1977, of activicies authorized by NRC Operating
License No. DPR-72 for the Crystal River 3 facility, and to the discussion
of our findings held with Mr. G. P. Beatty, Jr. at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
i
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. These
items and references to pertinent requirements are listed in the Notice
of Violation enclosed herein as Appendfx A.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201
requires you to submit to this office, within 20 days of your receipc of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
.- -
..
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this reporr contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
/m
h
(G
8002 280 75 k
.
.
_ _
_ _ _ .
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
d
.
-
-~
--
p.
,-,
4
Florida Power Corporation
-2-
-
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the infomation is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document. If we do not hear from you in this
regard within the specified period, the report will be placed in the
'
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Very truly yours,
ns
F. J. Long, Chief
Reactor Operations and Nuclear
Support Branch
)
-
/
Enclosures:
1.
Appendix A, Notice
'
of Violation
2.
RII Inspection Report No.
50-302/77-17
cc:
Mr. G. P. Beatty, Jr.
Naclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida 32629
_
l
!
l
)
s
._
,
_ . _ .
.
- . . _ .
- _ _ _ _
. . _ _
. _ . . . _ . . _ , _ _ . . _ . . . _ .
. . _ , , _ _ , . . . .__ , _ . . . ,
_