Forwards IE Insp Rept 50-302/77-17 on 770920-23 & Notice of Violation
ML19317G165
Person / Time
Site: Crystal River 
Issue date: 11/03/1977
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19317G158 List:
References
NUDOCS 8002280759
Download: ML19317G165 (2)


See also: IR 05000302/1977017

Text

,

_

w

s

N

[

>$ "Gug

UNITED STATES

(

jy

NUCLEAR REGULATORY COMMISSION

'

v

e

REGloN ll

~

{a

$

230 PEACHTREE STREET, N.W. SUtTE 1217

yy

8

ATLANTA. GEORGIA 30303

-

VUs I

g

%

NOV

31s/7

In Reply Refer To:

RII:RHW

50-302/77-17

Florida Power Corporation

.

Attu:

Mr. W. P. Stewart, Director

Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida

33733

i

Gentlemen:

'

This refers to the inspection conducted by Mr. R. H. Wessman of this

office on September 20-23, 1977, of activicies authorized by NRC Operating

License No. DPR-72 for the Crystal River 3 facility, and to the discussion

of our findings held with Mr. G. P. Beatty, Jr. at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

i

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. These

items and references to pertinent requirements are listed in the Notice

of Violation enclosed herein as Appendfx A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201

requires you to submit to this office, within 20 days of your receipc of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

.- -

..

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this reporr contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

/m

h

(G

8002 280 75 k

.

.

_ _

_ _ _ .

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

d

.

-

-~

--

p.

,-,

4

Florida Power Corporation

-2-

-

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the infomation is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document. If we do not hear from you in this

regard within the specified period, the report will be placed in the

'

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Very truly yours,

ns

F. J. Long, Chief

Reactor Operations and Nuclear

Support Branch

)

-

/

Enclosures:

1.

Appendix A, Notice

'

of Violation

2.

RII Inspection Report No.

50-302/77-17

cc:

Mr. G. P. Beatty, Jr.

Naclear Plant Superintendent

P. O. Box 1228