O ENVIRONMENTAL LICENSEE EVENT REPORT 77-161E/04X-0 0s 1.
Facility:
Crystal River hit #3 2.
Report Date:
18 January 1978 3.
Occurrence Date:
29-30 December 1977 (determined at plant 17 January 1978) 4.
Identification of Occurrence:
Biomass of fish and shellfish impinged on the intake screens of Units 1, 2, and 3 exceeded the 50 kg/24 hour reporting level of Section 3.1.3 of the Environmental Technical Specifications.
5.
Conditions Prior to Occurrenca:
4 hit il - All water circulation pumps operational.
hit #2 - All water circulation pumps non-operational (unit down) hit #3 - All water circulation pumps operational.
6.
Description of occurrence:
During the period 0900 29 December 1977 to 0900 30 December 1977, 828.02 kg of fish and shellfish were impinged on the intake screens at Crystc1 River Units 1, 2, and 3.
Of the 828.02,kg impinged, Unic #3 accounted for 761.63 kg (92 of total). Three finfish species accounted for 94% of the total biomass; scaled sardine 647.17 kg (78%), batfish 74.51 kg (9%), and the Atlantic thread herring 57.38 kg (7%). The remaining biomass impinged was distributed among several species of fish and shellfish.
7.
Designation of Apparent Cause of Occurrence:
)
The following unusual or periodic events were noted prior to, or during, the occurrence-i 1.
One oil barge entered the intake canal during the sempling period.
2.
The scaled sardine is a schooling fish. It is possible that an entire school was entrapped in the intake canal and subsequently impinged.
Thess events may have been partially responsible for the impingement observed.
/rc 8002 270
}
I
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000302/LER-1977-099, :on 770810,during Mode 1,primary Containment Average Temp Exceeded 130 F,Violating Tech Specs.Caused by Procedural Inadequacy Re Closed Industrial Cooling Water Supply Valve.Procedure SP-344 Revised |
- on 770810,during Mode 1,primary Containment Average Temp Exceeded 130 F,Violating Tech Specs.Caused by Procedural Inadequacy Re Closed Industrial Cooling Water Supply Valve.Procedure SP-344 Revised
| | | 05000302/LER-1977-104-01, /01t-1:on 770902,four RCS Flow Instruments Discovered Out of Calibr.Caused by Calibr Drift of Differential Pressure Transmitters.Transmitters Replaced. Instruments Will Be Calibr Every 18 Months | /01t-1:on 770902,four RCS Flow Instruments Discovered Out of Calibr.Caused by Calibr Drift of Differential Pressure Transmitters.Transmitters Replaced. Instruments Will Be Calibr Every 18 Months | | | 05000302/LER-1977-104, Forwards Rev 1 to LER 77-104 Re Four RCS Flow Instruments Exceeding Calibr Tolerances.Util Revising Commitment to Agree W/Tech Specs to Calibr Transmitters Every 18 Months | Forwards Rev 1 to LER 77-104 Re Four RCS Flow Instruments Exceeding Calibr Tolerances.Util Revising Commitment to Agree W/Tech Specs to Calibr Transmitters Every 18 Months | | | 05000302/LER-1977-158-03, /03L-0:on 771227,3B Emergency Diesel Generator Failed to Start During Monthly Surveillance Test SP-354. Caused by Foriegn Matter Preventing Governor to Function Properly.Servo Booster Cleaned & Tested | /03L-0:on 771227,3B Emergency Diesel Generator Failed to Start During Monthly Surveillance Test SP-354. Caused by Foriegn Matter Preventing Governor to Function Properly.Servo Booster Cleaned & Tested | | | 05000302/LER-1977-158, Forwards LER 77-158/03L-0 | Forwards LER 77-158/03L-0 | | | 05000302/LER-1977-159-03, /03L-0:on 771228,reactor Bldg Purge Exhaust Valve AHV-1B Did Not Auto Close Upon Reactor Bldg Purge Initiation.Caused by Purge Exhaust Valve AHV-1B Not Being Open Enough to Activate Automatic Closure Matrix | /03L-0:on 771228,reactor Bldg Purge Exhaust Valve AHV-1B Did Not Auto Close Upon Reactor Bldg Purge Initiation.Caused by Purge Exhaust Valve AHV-1B Not Being Open Enough to Activate Automatic Closure Matrix | | | 05000302/LER-1977-159, Forwards LER 77-159/03L-0 | Forwards LER 77-159/03L-0 | | | 05000302/LER-1977-160, E/04X-0:on 771221-22,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 50 kg/24-h ETS Levels. Partially Caused by Oil Barge Entering Intake Canal During Sampling | E/04X-0:on 771221-22,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 50 kg/24-h ETS Levels. Partially Caused by Oil Barge Entering Intake Canal During Sampling | | | 05000302/LER-1977-161, E/04X-0:on 771229-30,biomass of Fish & Shellfish Impinged on Intake Screens,Exceeding ETS Limits.Partially Caused by Oil Barge Entering Intake Canal During Sampling. Entire Scaled Sardine School May Have Been Trapped | E/04X-0:on 771229-30,biomass of Fish & Shellfish Impinged on Intake Screens,Exceeding ETS Limits.Partially Caused by Oil Barge Entering Intake Canal During Sampling. Entire Scaled Sardine School May Have Been Trapped | | | 05000302/LER-1977-163, Forwards LER 77-163/03L-0 | Forwards LER 77-163/03L-0 | | | 05000302/LER-1977-164, E/04X-0:on 771231 (Discovered 780111),correct Procedure Not Used for Environ Sample Analysis.Seawater, Small Terrestrial Animals & Vegetables Had LLDs Greater than ETS Requirements.Caused by Inadequate Sample Size | E/04X-0:on 771231 (Discovered 780111),correct Procedure Not Used for Environ Sample Analysis.Seawater, Small Terrestrial Animals & Vegetables Had LLDs Greater than ETS Requirements.Caused by Inadequate Sample Size | |
|