Monthly Operating Rept for May 1976
ML19317E540
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 06/10/1976
From: Blakeman E
DUKE POWER CO.
To:
Shared Package
ML19317E538 List:
References
NUDOCS 7912180765
Download: ML19317E540 (3)


Text

, -.

3 T Ocon*2 Unit 1 DATE 6/10/76 DOCKET NO.

50-269 PREPARED BY E. D.

Blakamnn l

OPERATING STATUS 1.

REPORTING PERIOD:

May 1 THROUGH May 31, 1976 GROSS HOURS IN REPORTING PERIOD:

744.0 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):2568_ NET CAPABILITY t

i (MWe-Net):

871 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)

None 4.

REASONSFORREfiTRICTION(IFANY) 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 19.7 1342.9 18115.0 6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 5.6 1135.6 16066.4 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH)3534 2616629 36840771 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 1140 906250 12800970 11.

NET ELECTRICAL ENERGY GENERATED (MWH)

-4691 842114 12080763 12.

REACTOR SERVICE FACTOR 2.6 36.8 71.8 13.

REACTOR AVAILABILITY FACTOR

.8 33.4 64.9 14.

UNIT SERVICE FACTOR

.8 31.1 63.7 15.

UNIT AVAILABILITY FACTOR

.8 31.1 63.8 16.

UNIT CAPACITY FACTOR (Using Net 26.5 55.0 Capability) 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 26.0 54.0 18.

UNIT FORCED OUTAGE RATE 26.7 6.9 16.1 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

20.

IF SHUTDOWN AT END OF RE20RT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAI X 100 HOURS IN REPORTING PERIOD REACTOR AVAILtBILIM FACTOR = HOUPS REACTOR k'AS AVAIL \\RI.f' TO OPERATE X 100 110UI;S IN REPORTING PERIOD UNIT SERVICE FACTOR

= HOUPS CENERATOR ON L7NE X 300 HOURS IN REPORIING PERIOD UNIT AVAIL \\3ILITY FACTOR = 1101'RS ITNTT WAS r"ATI ABLE TO GENERATE X 100 HOURS IN REPukIING PERIOD UNIT CAPACITY FACTOR

= NET ELECTRICAL P0bER CENERATFD

_ s,, P 0 (ikt Capability or Design (We-Ns t).1 X 110URS LN RH u r'tNC FERIOD UNIT FORCED OUTACE RATE e F0ECFD OUTAGE HOUn3 X R0 HOURS GENhmTOR ON !.INE + FORCED CurAGE HOURS 7912180 755

m r

DOCKET NO. 50-269 UNIT oconee Unit 1 DATE 6/10/ 6 7

AVERAGE DAILY UNIT POWER LEVEL MONTH May, 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe net) 1 17 2

18 3

19 4

20 5

21 6

22 7

23 8

24 9

25 10 26 11 27 12 28 13 29 14 30 31 12 16 DAILY UNrr POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Ccmpute to the nearest whole megawatt.

These figares will be used to plot a graph for each 14c: I'g month. Note that by using maximum deper.1able capacity for the net electrical rating of the u.. there may be.>ccasions when the daily rJcange power level exceeds the 1007e line (or the restre l power level line). In such c.ises, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

D5CKtiT NO.

50-269 UNIT SHUTDOWNS UNIT NAMii Oconee Unit 1 DATli 6/10/76 Rlil' ORT MONTil May, 1976 TYPE METilOD OF F FORCED DURATION SituTTING DOWN NO, DATE S SCllEDULED (tiOURS)

REASON O)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS

)

3

/60501 S

736.47 A

1 Continuation of previous outage 4

760531 F

1.97 11 3

Reactor trip due to high Reactor Coolant System pressure l

(1) REASON (2) METilOD A - EQUIPMENT l-AILURE (EXPLAIN) l-MANUAL B-MAINT. OR TEST.

2-MANUAL C-RLi'UELING SCRAM e i D-REGULATORY RESTRICTION 3 - A UTOM ATIC L-OPER ATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPLRATIONAL LRROR (LXPLAIN)

II-OlllLR (EXPLAIN)

)

\\

1 SUMWARY:

lnspection and repair of reactor internals completed.

.-.