udIT Oconto Unit 3

) DATE 6/10/76 DOCKET NO. 50-287 PREPARED BY E. D. Blakeman OPERATING STATUS

1. REPORTING PERIOD: May 1 THROUGH May 31. 1976 GROSS HOURS IN REPORTING PERIOD: 744.0
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 871
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) None
4. REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative

5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 2757.2 9901.5
6. REACTOR RESERVE SHUTDOWN HOURS
7. HOURS GENERATOR ON-LINE 744.0 2724.6 9673.3
8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (MWH) 1903700 6411429 22329479
10. GROSS ELECTRICAL ENERGY GENERATED I (MWH) 659420 2207640 7652554
11. NET ELECTRICAL ENERGY GENERATED (MWH) 632295 2106479 7284913
12. REACTOR SERVICE FACTOR 100.0 75.6 77.4
13. REACTOR AVAIIABILITY FACTOR 100.0 74.9 79.4
14. UNIT SERVICE FACTOR 100.0 74.7 75.6
15. UNIT AVAILABILITY FACTOR 100.0 74.7 75.6
16. UNIT CAPACITY FACTOR (Using Net 97.6 66.3 65.4 Capability)
17. UNIT CAPACITY FACTOR (Using Design Mwe) 95.8 65.1 64.2 ~
18. UNIT FORCED OUTAGE RATE 25.3 15.8
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

September 1, 1976 - Refueling (5 weeks)

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAI. '

IICURS IN REPORTING t'ERLOD REACTOR AVAILABILIW FACTOR = HOURS RT. ACTOR WAS AVAIL \ril.E TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE PACTOR = HO!T9 GT2ERATOR ON L7 NE X 100 HOURS IN REPORTING PERIOD UNIT AVAII.\3ILITY FACTOR = Hot'RS UNTT WAS A'lA11 AGI.C TO GENEPATE X 100 HOURS IN REPukIING t'ERIOD UNIT CAPACITY FACTOR = NET ELECTRICAL P0hER GT.Nr.RATFD _ g.

(Net Capability or Design (!Ne-E L).1 X llOURS IN Rh %.

PERICD UNIT FORCED OUTACE RATE = FORCFD OtTTAGE HOURS 7n1 m

  • HOURS GENERATOR ON 1.INE f ITRfE@ CY M

m

\

. 1 DOCKET NO. 50/287 UNIT oconee Unit 3 DATE 6A0'76 AVERAGE DAILY UNIT POWER LEVEL MONTH May, 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) .

817 17 856 1

852 2 828 18 820 19 856 3

860 4 827 20 21 857 5 831 843 22 860 6

858 23 857 7

861 24 858 8

862 25 852 g

854 26 849 10 -

862 27 847 11 862 28 843 12 862 29 844 13 858 30 846 14 856 31 846 15 854 16 DAILY UNir POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usini, maximum dependable capacity for the net electrical rating of the unit. there may be occasions when tite daily average power level exceeds the 1007o line (or the restrteted power lesel linch In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

D CKET NO. 50-287 UNIT SHUTDOWNS UNIT N AMii Oconee Unit 3 DATli 6/10/76 .

Rl! PORT MONTil May, 1976 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) RE ASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS )

(1) REASON (2) METilOO A -EQUIPMENT F AILURE (E?* LAIN) 1-MANUAL B- MAINT. OR TEST. 2-MANUAL C- RLi'L'ELING SCRAM 'j D-REGULA10RY RESTRICTION 3- AUTOM ATIC E-OPER ATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPER ATION AL LRROR (LXPLAINI Il-OIllLR (EXPLAIN) l

SUMMARY

No outages this month.

.