Monthly Operating Rept for May 1976
ML19317E542
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/10/1976
From: Blakeman E
DUKE POWER CO.
To:
Shared Package
ML19317E538 List:
References
NUDOCS 7912180766
Download: ML19317E542 (3)


Text

.

m ~

G UNIT Ocon u Unit 2 O

DATE 6/10/76 DOCKET NO. 50-270 PREPARED BY E. D. Blaketnan OPERATING STATUS

1. REPORTING PERIOD: May 1 THROUGH May 31. 1976 GROSS HOURS IN REPORTING PERIOD: 744.0
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 871
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) None
4. REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative

5. NUMBER OF HOURS THE REACTOR WAS CRITICAL -

2112.4 10671.4

6. REACTOR RESERVE SHUTDOWN HOURS
7. HOURS GENERATOR ON-LINE 2076.5 10356.0
8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (MWH)- 4922491 24594919
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 1678100 8378656
11. NET ELECTRICAL ENERGY GENERATED (MWH) -1343 1596981 7952132
12. REACTOR SERVICE FACTOR 57.9 70.5
13. REACTOR AVAIIABILITY FACTOR -

57.2 68.9

14. UNIT SERVICE FACTOR 56.9 68.4
15. UNIT AVAILABILITY FACTOR -

56.9 68.4

16. UNIT CAPACITY FACTOR (Using Net -

50.3 60.3 Capability)

17. UNIT CAPACITY FACTOR (Using Design Mwe) -

49.4 59.2 *

18. UNIT FORCED OUTAGE RATE 100.00 36.4 27.6
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

June 28, 1976 REACTOR SERVICE FACTOR = HOURS REACTOR WAS C:tTTICAL X 100 UCURS IN REPORTING PERLOD REACTOR AVAIIABILITY FACTOR = HOUFS Rr3CTOR WAS AVAIL \iiLE TO OPERATE X 100

!!0URS IN KLFCRTING PER100 ]

UNIT SERVICE FACTOR = HOUPS CD:ERATOR ON f INE X 100 HOURS IN REPORTING PERIOD UNIT AVAILABILITY FACTOR = '.10CRS UNTT '.'AS A'.'ATI ABLE TO GENEitATE X 100 210URS IN REPokTING PERIOD UNIT CAPACITY FACTCR = NET ELECTRICAL POhER GENT.RATFD _ s. M (N.i t C.ipability or Desir,n 7 LN NE"nh r"tNc. l PERIOD A M } $ Qy" 0 1 X llot'RS UNIT FORCED OUTACE RATE = FORCFD OUTAGE Hot"t:i 100 H01.'KS GENERATOR ON LINE + FORCED CUTAGE HOURS

~

l DOCKET NO. 50-270 UNIT oconee Unit '2 1

DATE 6/10/76 I

AVERAGE DAILY UNIT POWER LEVEL MONTH May, 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) .

1 17 18 2

3 19

~

4 M

5 21

~

6 22 7

23

~

8 24 9

25 10 M

~ -

11 27 12 28 ,

~

13 29 14 30 15 31 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month. ,

Compute to the nearest whole megawatt. l These figures will be used to plot a graph for each reporting month. Note that by using maxiraum dependable capacity for the net electrical ratin.; of the unit. there may be occasions when the daily average power level exceeds the 1003 line (or the restricted power level hne). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

D5CKET NO. 50-270 UNIT SHUTDOWNS UNIT N AMli Oconee Unit 2 I)ATI: 6/10/76 REPORT MONTil __ May,1976 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (IlOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS )

5 760501 F 360.0 A 1 Continuation of previous outage 6 760515 S 384.0 C 1 Refueling outage (1) REASON (2) METHOD A -LQUIPMENT l AILURE (EXPLAIN) 1-MANUAL B- M AINT. OR TEST. 2-MANUAL C- RLI~ ULLING SCRAM '

l D-REGULAlORY RESTRICTION 3- AUTOM ATIC E-OPER ATOR TR AINING AND SCR AM LICLNSE EXAMINA110N F- ADMINISTR AllVE G-OPLRATIONAL LRROR ILXPLAIN) 11 -OlllL R (EXPLAIN)

SUMMARY

Inspection and repair of reactor Internals completed. Reactor remained shutdown for refueling.