Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 09/15/1978
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML19317E486 List:
References
NUDOCS 7912180733
Download: ML19317E490 (5)


Text

- - - .. .. - .- - ._. - .

' ~

.O OPERATING DATA REPORT DOCKET NO. 50-269 DATE 9-15-78 ,

COMPLETED BY J. A. Reavis TELEPHONE (704) 373-8552 OPERATING STATUS Oconee Unit 1 Notes

1. Unit Name: Year-to-date and cumulative

.. Reporting Period: August, 1978 capacity factors are calcu-3 2568

3. Licensed Thermal Power (Mht): lated using a weighted aver-
4. Namep'. ate Rating (Gross Mhe : 93 age for maximum dependable i 3
5. Design Electrical Rating (Net Mhe); capacity.
6. Maximum Dependable Capacity (Gross Mwe): 899 Maximum Dependable Capacity # Net MWe): 860 .

)

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

. None i

9. Power Lese! To which Restricted. !f Any (Net MWe): None
10. Reasons For Restrictioru. lf Anv:

l l

1 3

This Month Yr. co Date Cumulatise

11. Hours In Reporting Period 744.0 5,831.0 44,952.0
12. Number Of Hours Reactor was Critical 695.9 4.844.1 32.583.1
13. Reactor Resene Shutdown Hours
14. Hours Generator On.Line 670.4 4,780.4 30,202.1
15. Unit Resene Shutdown Hours

. 16. Gross Thermal Energy Generated (MWH) 1,457,934 11,819,152 70.442,007 .

17. Gross Electncal Energy Generated (MWH) 495,800_ 4,113,750 24,423,390
18. Net Electrical Energy Generated (MWH) 466,991 3,914.326 23.091,253
19. Unit Senice Factor 90.1 82.0 67.2

, 20. Unit Availability Factor 90.1 82.0 67.3 21 Unit Capacity Factor iUsing MDC Neti 73.0 78.1 59.4 __

22. Unit Capacity Factor (Using DER Net) 70.8 75.7 57.9
23. Unit Forced Outage Rate 9.9 18.0 18.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eachi:

Refueling - 6 week

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION 381s18o733 (4/77 n

IlNil SillllllOWNS AND POWI.R Hilit;CllONs IMMKI I NO. 50-269 UNil NAMI _0 cone _e _llnit 1 ,

DAll. .1-15_18 Rt.rORI MONill August, 1978 COMPI I:ll.ls itY J ._A . _Reavi s _ ,,,

11-l.1 PilONI. (704) 313-855_2_

Ni i . D.n e g

.5g 33 3 )E litemcc Ivent

,E g fL Came A Cosictiive F y 4 j :j E yy e? Adion in fE 3 g }e e.

Itcpine n in U U

S' l'oevent Retorient e 6

3 17 78-08-02 F 12.90 A 3 IIA IllSTRU Malfunction in trip mechanism while performing test PT/290/05.

18 78-08-03 F 42.11 A --

RB CRDRVE Replaced CRD stator on Rod 10 Gp 1.

19 78-08--05 F 18.63 A 1 IIJ PIPEXX Crack in turbine extraction line to "B" IIP heaters.

20 78-08-07 F ~ - - D --

RC FUELXX Xenon hold.

21 78-08-18 F --

D --

RC FUELXX Indicated incore tilt problem.

22 78-08-25 F --

A --

RB CRDRVE Control Rod I on Gp. 7 dropped because of a stator problem.

_ s__

l 2 3 l T: Fini ed Rc.isini. Methad: 1.sinliii G Imieniinim S Stliedulcil A I quipnieni I aihne (1.splain) l Manual los ricpaiaison of Data 11St.iinien nu e ni I est 2 Mann.d St rain. I nisy Slieces 1.n 1.ncmec C.lielocling .l. Antoin.itit- St rain I' vent Rcpina 11 i RII sie INilRI G D.Rcrolainey Restsiiliini l-Ollierll= plaint (18611 1 -Opcs.stos liaining;& liacuse l'sanoin: lion F. Ailininist ealise 5

(, Opci.ilion.il 1:s ens 11:xpl. sin) 1.sluliit 1 S sne Sinn c l's/7 / ) I!-Ollice (l xplain)

AVERAGE DAILY UNIT POWER LEVFL DOCKET NO. 50-269 UNIT Oconee Unit 1 DATE 9-15-78 COMPLETED BY J. A. Reavis TELEPHONE (704) 373-8552 MONT11 August, 1978 DAY AVERAGE DA!LY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mke-Net) (MWe-Net) 1 853  ;- 839 2 747 gg 809 3

~

D 39 4 20 741 5

,g 743 6 362 22 742 7 593 752 3

8 763 ,4 813 9

823 790 25 10 846 26 402 11 840 405 7

841 422 12 ,3 13 831 442

___ ,9 14 843 444 30 15 843 31 437 16 842 INSTRUCTIONS On this formst. list the average daily unit power level in MWe-Net for each day in the repomng month. Compute to the nearest whole megawstt.

10/77)

KET NO: 50-269 UNIT: Oconee Unit 1 DATE: 9-15-78 NARRATIVE SUBSULRY MONTH: August, 1978 The month began with Unit 1 operating at near rated power. On August 2 during a weekly simulated turbine trip test PT/290/05, the unit tripped due to a mal-function in the trip mechanism. A reactor trip followed in which the CRD stator on Croup 1 Rod 10 had to be changed out before returning to service.

Shortly after returning to service on August 5, the unit was forced off to repair a crack in the "B" HP heater extraction line near the turbine. The reactor remained critical during this period and the unit was returned to service again on August 6 at 00:03 hrs. After normal xenon hold,near rated power was reached on August 9.

Power was reduced to 80% on August 18 to investigate the indication of an it. core tilt problem. After evaluation of the pcoblem, power was increased and reached near rated power on August 23.

On August 25 control rod 1 on group 7 dropped because of a stator problem and 4

caused a runback in power. Power level of 53% was established and a decision was reached to operate at this level until the refueling outage which is to begin on September 2.

i Y

I t

d t

g , , , . - y+-,. p ir- 4 e.. s e -,--r .mgyy.. .-q9 y 9-- .. , ,+n-

MO.f!'HLY Pm ut. LING INF0Fy.CION RI, 1.ST l i

l l

1. Facdity nane: Oconee Unit 1 . j
2. Scheduled next refueling shutdown: [ . I
3. Scheduled restart following refueling: October 13, 1978 .

1

4. Will refuel d g or resumption of operation thereafter require a technical i 1

specification change or other license amendnent? Yes . I If yes, what wdi' these be?

Amendment to incorporace technical specifications for Cycle 5.

Submitted June 26, 1978 _

l 1

l 1

l l

l If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safsty questions? .

If no, when is review scheduled? .

5. Scheduled date(s) for submitting proposed licensing action and supporring d

'ornation: See Item 4 _.

6. Inportant licensing eensiderations (new or different design or supplier, unreviewed design or performance analysis nethods, sig=ificant changes in design or new operating procedures). None i

l l

1

7. Number of fuel assemblies (a) in the core: 27 .

(b) in the spent fuel pool: 109 .

8. Present licensed fuel pool capacity. 306 in Oconee 1 & 2 pool ,

Sine of requested or planned increase: no increase olanned .

9. Projected date of last refueling which 'can be accommodated by present 11uensed capacity: 3/3/80 assuming no transfers to McGuire, ,

DUKE POWER COMPANY Date: September 15, 1978 ,

Name of

Contact:

J. A. Reavis ,

- - - e- - - . - , - . - - . . , - - - . - - , . - . . - - _ - . - , - - . .. -.-m- + - - , ---- .---