Text
-
4 OPERATING DATA REPORT DOCKET No. 50-287 DATE 9-15-78 COMPLETED BY
.T.
A. Reavis TELEPHONE (704) 373-8552
- OPERATING STATUS
- 1. Unit Name*.
Oconee Unit 3 No t*5 Year-to-date & cumulative
- 2. Reporting Period:
Aueust, 1978 g
g 2568
- 3. Licenad Thermal Power (MWt):
lated using a weighted aver-934 age for maximum dependable
- 4. Nameplate Rating (Gross MWe):
887
- 5. Design Electrical Rating (Net MWe).
capacity.
- 6. Maximum Dependable Capacity (Gross MWe): 899 860
- 7. Maximum Dependable Capacity (Net MWe):
S. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted,1f Any (Net MWe):
None
- 10. Reasons For Restrictions,if Any:
This Month Yr..to.Date Cumulative 744.0 5,831.0 32,519.0
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 742.0 4,832.1 24,996.7
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 738.4 4,717.3 24,291.0
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1,848,612 11,464,054 57,697.374
- 17. Gross Electrical Energy Generated (MWH) 644,400,_,
3,999,360 19,951,204
- 18. Net Electrical Energy Generated (MWH) 615.284 3.812,792 18,985,399
- 19. Unit Service Factor 99.2 80.9 74.7 99.2 80.9 74.i
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 96.2 76.0 67.4
- 22. Unit Capacity Factor (Using DER Net) 93.2 73.7 65.8
- 23. Unit Forced Outage Rate 0.8 3.5 12.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each 3:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
.T$1Nl p7,
50-287 IlNII SIIU1 DOWNS AND POWI.R Hl:DiffilONS IMM'KI:I NO.
UNil NAMI-Oconee Unit 3 DAII; 9-15-78 RI~POR I MONlli August, 1978 COMPI I II!D IlY J'-A' Reayle__
11dl.i.PIIONii,_(1_Qhl_37.h8552 5 w2 Li
=_
ri
,gX l. s. trance g e, c4 C.iuse.% rais ert live
?! e N"-
Dd'c 3@
4 isE I: vent
~?
$'?
Attionin
$E ch F
~ jj g Repois n ifi0 E
Psevent ltrtursente
~;
e o
o r
27 78-08-08 F
2.65 A
3 IIA CKTBRK MCC 3XA tripped causing loss of power to EllC system pumps.
28 78-08-08 F
D RC FUELXX Xenon hold.
29 78-08-25 F
2.98 A
3 Cll INSTRU Swing in feedwater systen caused flux / flow imbalance tripping reactor.
30 78-08-25 F
D RC FUELXX Xenon hold.
i l
2 3
l': I ori ed Reauin :
Method:
1:.shibit G Insiini sions S Schetfulcil A l'quipment Failme(I.xplain)
- 1. Manual fin Picp. nation os Data 11 Maintenance of Test 2 M.innal Scram.
1:nley Sheets li> Iitensec C-Relucling 1 Automitic Straen.
1: vent Reposi lI l~lu i nte INilRI G D-Regulatiny Restsittinn l-Ot her (lixplain)
(H eil )
1-'-Operalor l~rainint:A l.it ense I:uminalion itAdministrative s
G Opcs stional 1:ssos (1:xpl. sin) thhihil 1 S.nne.%.nece l'8/71) 11 Othes (lixplain)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT Oconee Unit 3 9-15-78 DATE
^'
COMPLETED BY (704) 373-8552 TELEPHONE August, 1978 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mbe-Net) t MWe-Net I j
847 849 3
2 855 853 33 3
852 852 39 851 852 4
3 851 852 6
850 850 2,
7 852 841
,g 3
613 846 3
805 512 9
10 847 799
,3 11 845 836 7
12 854 840 33 13 E55 846
,9 14 845 846 30 15 848 846 3t 16 846 INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
to!77)
uoCKET NC:
30-287 UNIT: Oconee Unit 3 DATE:
9-15-78 NARRATIVE SU.T!ARY MONTH: August, 1978 The unit ran at near rated power until a trip on August 8 caused by a power loss to the EHC system pumps when the 3XA (switchgear) MCC tripped.
Power was restored and the unit returned to service the same day and near rated power was reached on August 9.
On August 25 the unit tripped because of flux / flow imbalance experienced during a swing in the feedwater flow. Again the unit was returned to service the same day and af ter reaching.near rated power on August 26, remained at this level the duration of the month.
%. X Y Fcru..i.ING INFCFy.RTION ret 2ST o
1.
Facility name: oconee Unit 3 2.
Scheduled next refueling shutdown:
July 29, 1979 3.
Scheduled restart following refueling: September 16, 1979 4.
W4'1 refue'd g or resumption of operation thereafter require a tecnnical specification change or other license amendment?
If yes, what will these be?
Amendment to incorporate technical specifications for Cycle 5.
If no, has reload design and core configuration been reviewed by Safety Review Committee regard 1=g unreviewed safety questions?
If no, when is review scheduled?
5.
Scheduled date(s) for submit *d g proposed licensing action and supporting information:
June 16, 1979 6.
I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis nethods, sig 4#icant changes in design or new operating procedures). None 7.
Number of fuel asaemblies (a) in the core: 177 (b) in the spent fuel pool:
324 8.
Present licensed fuel pool capacity: 465 Size of requested or planned increase: no increase n12nnea 9.
Projected date of last refueling which 'can be accommodated by present licensed capacity:
3/3/80 assuming no transfers to McGuire.
DUKE POWER COMPANY Date: September 15, 1978 Name of
Contact:
J. A. Reavis
,-p.,
,--.,,~a,-,-
r-e e,
re--
n w--
OCONEE NUCLEAR STATION MONTHLY OPERATING REPORT July, 1978 1.
Personnel Exposure For the month of July no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
Radioactive Waste Releases f
The total station liquid release for July has been compared with the Technic 31 Specifications annual value of 15 curies; the total release for July was less than 10 percent of this limit.
The total station gaseous release for July has been compared to the derived Technical Specifications annual value of 51,000 curies; the total release for July was less than 10 percent of this limit.