Forwards IE Insp Repts 50-269/78-06 & 50-270/78-06 on 780314-16 & Notice of Violation
ML19316A186
Person / Time
Site: Oconee, Crane  Duke Energy icon.png
Issue date: 04/05/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19316A179 List:
References
NUDOCS 7911280721
Download: ML19316A186 (2)


See also: IR 05000269/1978006

Text

h),/

pa r8Goq)g

UNITED STATES

NUCLEAR REGULATORY COMMISSION

,

) e,, ,

, s.. ( ,'

e

REGloN il

f-

g

230 PE ACHT RE E STRE ET, N.W. SUITE 1217

kk 7

ATLANTA GEORGI A 30303

%*/

APR

5 1978

  • ...*

In Reply Refer To:

RII:NE

50-269/78-6

50-270/78-6

50-287/78-6

,

Duke Power Company

Attn:

Mr. William O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

422 South Church Street

Charlotte, North Carolina

28242

Gentlemen:

.

This refers to the inspection conducted by Mr. N. Economos of this

office on March 14-16, 1978, of activities authorized by NRC Operating

License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Unit 1, 2 and 3

,

facilities, and to the discussion of our findings held with

Mr. J. E. Smith, Station Manager at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously

reported unresolved items. The status of these items is discussed in

the enclosed report.

.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements.

This

item and references to pertinent requirements are listed in the Notice

of Violation enclosed herewith as Appendix A.

This notice is sent to

you pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

,

1

--

,

V

-.

- . -

.- . - .-

. - -

. .. ..:7911280 "(

.. .

,

-

r

-.

-

- . . . - . -

',

APR

E E7L

-

i,

.

j

.

Duke Power Company

-2-

!

i

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

A

/

-

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

1.

Appendix A, Notice

of Violation

2.

RII Inspection Report Nos.

50-269/78-6

50-270/78-6

50-287/78-6

cc w/ enc 1:

Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

P. O. Box 1175

Seneca, South Carolina 29678

,

'

,.