i NOTICE OF VIOLATION Duke Power Company License No.: DPR-47 Based on the results of the NRC inspection conducted on March 14-16, 1978, it appears that certain of your activities were not conducted in full compliance with NRC requirements as indicated below. These items have been categorized as described in our correspondence to you dated December 31, 1974.
10 CFR 50.55a(g)(4) as implemented by the Technical Sepcification Paragraph 4.2 specifies that post-operational inspections of components shall be made in accordance with the methods and intervals indicated in IS-242 and IS-261,Section XI of the ASMI Boiler and Pressure Vessel Code,1970, including 1970 winter addenda.
Paragraph 15-242 of the Code states in part that at least 25 percent of the required examinations shall have been completed by the expiration of one-third of the inspection interval....
Contrary to the above requirement on March 16, 1978, the licensee had failed to meet the 25 percent minimum inspection completion requirements on Unit 2 for Items 1.3, 1.14 and 1.15 under Categories C, I and N as listed in Table IS-261.
This is an infraction.