ML19316A146
| ML19316A146 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/16/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19316A144 | List: |
| References | |
| NUDOCS 7911280686 | |
| Download: ML19316A146 (2) | |
See also: IR 05000269/1978012
Text
e
- - _ - - - - - - - - . -
- - - _ _ _ - - -
,
,
!
'!]'(l} g8"Guq[o
UNITED STATES
NUCLEAR REGULATORY COMMISSION
{
'
g } ) y,( [ g
REGloN il
g
. * \\ W 'f
g
230 PEACHTREE STREET, N.W. SUITE 1217
il
f
ATLANTA, GEORGI A 30303
os, v /
JUN 161978
In Re, y Refer To:
f.10
QO-26
8-1_2
50-4/v//o-11
50-287/78-11
Duke Power Company
Attn:
Mr. William O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
422 South Church Streer
-
Charlotte, North Carolina
28242
Gentlemen:
This refers to the inspection conducted by Mr. J. E. Ouzts of this
office on May 9-12, 1978, of activities authorized by NRC Operating
License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Unit 1, 2 and
3 facilities, and to the discussion of our findings held with
Mr. R. Koehler'at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements.
This item
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement er explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
0b
T91128
,
.
,e
-mw
= = + -
<-mmam-
-
-e
e-
em
e m
v'
-